Data centre design from feasibility to BIM handover

SoSo CAD calculates layout, the A/B power chain, cooling and cost from the same project data. Run failure scenarios while you design, compare alternatives on CAPEX and TCO, and deliver in PDF, Excel, DXF and IFC4.

The personal plan is free and includes one project, guided design, and N+1, 2N and block-redundant comparison with an indicative capital cost range.

Layout of the 400 kW, 2N, 40-rack sample project.
Sample project layout produced with guided design.
Open the image to inspect the detail.

IT served400 / 400 kW

Sample project; capacities are catalogue assumptions.

From requirements to an editable layout

Enter IT load, rack density, redundancy level, cooling type and location. Guided design turns them into an editable layout with data hall, rack rows, electrical rooms and power chain. Every default shows where it comes from, and you replace it as project data arrives.

  • Start from a reference design if you prefer.
  • Requirements stay linked to the layout and the equipment list.
400 kW load and 2N redundancy inputs in guided design.
Load and redundancy inputs in guided design. The pack counter shows selections from 33 standards packs and 4 general rule packs.
Open the image to inspect the detail.

Capacity left after a failure or during maintenance

Take a UPS, a feeder or a shared failure zone out of service. SoSo CAD works out which racks stay powered, which components are overloaded and how cooling is affected, so the need for a revision shows up before the project moves on.

UPS A and B load sharing in normal operation.
Normal operation
Open the image to inspect the detail.
UPS B taking the load after UPS A fails.
UPS A failure
Open the image to inspect the detail.

UPS B, normal operation200 / 405 kW

UPS B, with UPS A failed400 / 405 kW

IT served after failure400 / 400 kW

The scenario calculates steady-state capacity; continuity during transfer is checked separately against manufacturer data.

  • Normal operation and the failure case are compared on the same single-line diagram.
  • Shared dependencies between the A and B paths are listed.

Standards pre-assessment and sources

Thirty-three pre-assessment packs cover Tier topology self-checks, TIA-942 Rated targets, EN 50600 and TS EN 50600 classes and a fire-protection review list. Each finding is tied to the equipment and evidence behind it, and calculation inputs can be traced to their source in the library.

  • Items without evidence stay unknown; they never count as compliant.
  • Manual review decisions are recorded with their reasoning.

Example check: UPS B capacity

Post-failure load / rated limit400 / 405 kW

Input
400 kW
Assumed catalogue capacity
405 kW
Utilisation
98.8%
Headroom
5 kW

Method: post-failure load / rated capacity. The capacity comes from the sample project’s generic UPS catalogue record; in your own project you replace it with manufacturer data.

Technical reference for the power-demand method

Capacity and cost before you choose a design

Put N+1, 2N and block-redundant options for the same IT load side by side. Installed capacity, failure results, low, typical and high CAPEX, energy and TCO appear in one table, so you can justify the choice on technical and economic grounds.

The sample project’s assumption-based CAPEX, TCO and NPV study.
Cost study. Prices are low-confidence assumptions; totals with unpriced items are shown as lower bounds.
Open the image to inspect the detail.

Typical CAPEX (assumed)2,099,424 USD

  • Capital and operating costs are assessed together.
  • Items without a price mark the total as a lower bound.

Who uses it

Investors, operators, consulting engineers and contractors review the same design from the angle of their own responsibilities.

Investors and developers

Weigh capacity against CAPEX and TCO and take alternatives to the investment committee on the same assumptions.

Colocation operators

Compare growth phases and redundancy options on capacity and cost.

MEP and electrical consultants

Produce calculations, findings and schedules from one revision.

Enterprise IT and facilities teams

Turn requirements into design criteria and work from the same model as their consultant.

EPC contractors

Define the bid scope from the equipment list, schedules and IFC and DXF output.

Free calculators

Ten calculators are open to everyone: capital cost, PUE and energy, UPS runtime, cooling, rack count and area, N+1 and 2N, carbon, free cooling by location, battery TCO and generator sizing. Each one shows its formula, assumptions and sources.

To evaluate SoSo CAD on your own project, get in touch.