Data centre design with SoSo CAD

SoSo CAD calculates layout, the A/B power chain, cooling and cost from the same project data. Run failure scenarios while you design, compare alternatives on CAPEX and TCO, and deliver in PDF, Excel, DXF and IFC4.

From requirements to an editable layout

Enter IT load, rack density, redundancy level, cooling type and location. Guided design turns them into an editable layout with data hall, rack rows, electrical rooms and power chain. Every default shows where it comes from, and you replace it as project data arrives.

  • Start from a reference design if you prefer.
  • Requirements stay linked to the layout and the equipment list.
From requirements to an editable layout
From requirements to an editable layout The pack counter shows selections from 33 standards packs and 4 general rule packs.
Open the image to inspect the detail.

Capacity left after a failure or during maintenance

Take a UPS, a feeder or a shared failure zone out of service. SoSo CAD works out which racks stay powered, which components are overloaded and how cooling is affected, so the need for a revision shows up before the project moves on.

  • Normal operation and the failure case are compared on the same single-line diagram.
  • Shared dependencies between the A and B paths are listed.
Capacity left after a failure or during maintenance

Standards pre-assessment and sources

Thirty-three pre-assessment packs cover Tier topology self-checks, TIA-942 Rated targets, EN 50600 and TS EN 50600 classes and a fire-protection review list. Each finding is tied to the equipment and evidence behind it, and calculation inputs can be traced to their source in the library.

  • Items without evidence stay unknown; they never count as compliant.
  • Manual review decisions are recorded with their reasoning.
Standards pre-assessment and sources

Capacity and cost before you choose a design

Put N+1, 2N and block-redundant options for the same IT load side by side. Installed capacity, failure results, low, typical and high CAPEX, energy and TCO appear in one table, so you can justify the choice on technical and economic grounds.

  • Capital and operating costs are assessed together.
  • Items without a price mark the total as a lower bound.
Capacity and cost before you choose a design

DCIM hand-off

Export locations, cabinets, equipment and connections as a generic CSV and Excel package. Map columns to your DCIM template and review unknown values in the validation report. The dcTrack and Nlyte profiles are starter mappings to verify against the template for your version.

API and DCIM hand-off

BIM handover with IFC4

Equipment is exported to IFC4 with the appropriate IFC classes and property sets, and with storeys and spaces in their hierarchy. The output is intended for coordination at concept and design-development stage.

Building shell import

Storeys, spaces, walls, columns, slabs and doors are imported from IFC2x3 or IFC4. GlobalIds are preserved, and changes coming back from Revit are shown for your approval. Unsupported geometry stays as an underlay. Try the Revit round trip with your own model on a first project.

Drawing exchange with DXF

DXF underlays are imported, and closed boundaries you select become spaces once you confirm them. Layered 2D geometry is exported as R2013 DXF. Drawings are at layout level, without construction detail. The standard distribution has no DWG converter.

To evaluate SoSo CAD on your own project, get in touch.

Data centre events and new resources

Once a month: newly added sources, changes to Turkish regulations and upcoming data centre events.