Data centre engineering from layout to handover

Turn requirements into design criteria, develop the layout together with power and cooling infrastructure, and calculate failure and maintenance cases. Hand over with a calculation report, schedules, DXF and an IFC4 model.

Data hall and A/B electrical rooms in the sample project.

Design

Design criteria

IT load, rack density, redundancy, cooling type and location set the starting criteria. Guided design produces an editable layout from them, and each field shows where its default value comes from.

  • Start from a reference design if you prefer.
  • Assumptions are updated as project data arrives.
Start free
Guided design inputs.
Guided design inputs. The personal plan is free and includes one project. The pack counter shows selections from 33 standards packs and 4 general rule packs.
Open the image to inspect the detail.
Enlarge video

Layout and infrastructure connections

Place halls, racks and equipment on a DXF, PDF or image underlay. Power chains, cable routes and cooling dependencies are tied to the layout. Plan, rack elevation, single-line diagram and 3D view are all generated from the same model.

  • Layout clashes and maintenance clearances are checked.
  • Rack load is shown together with its supply chain.
  • Air and liquid cooling loads are tracked separately.

Cooling, energy and water

Required airflow is calculated from sensible heat, and inlet conditions are compared with the selected ASHRAE A1–A4 class. Free-cooling hours come from the site’s climate data; PUE and WUE are estimated from annual energy and water inputs. Missing climate, energy or water data is marked unknown.

  • Screen rack orientation, containment gaps, reach and airflow risks on the plan.
  • Hand off generic CSV/JSON and, when licensed, IFC4 to CFD tools.
Airflow risk layer and status legend on the sample project.
Rule-based screening of rack orientation, density, containment and cooling reach.
Open the image to inspect the detail.

Airflow screening method

Rule-based screening does not replace CFD analysis. Power density is available on the personal plan; risk rules and CSV/JSON hand-off require the cooling module, with IFC export entitlement also required for the IFC4 portion.

Verification

Failure and maintenance scenarios

Apply equipment loss, maintenance states or combined events of your choice to the model. A/B load transfer, de-energised racks and overloaded components are calculated. Shared rooms, sources and cooling dependencies let you test the redundancy decision.

Enlarge video
  • A single-failure sweep lists the affected loads.
  • The effect of a power loss on cooling is shown.

Electrical calculations

Voltage drop is calculated from cable route and load. For a selected single-transformer radial circuit, short-circuit current is compared with the breaking capacity of the breaker at that point. UPS autonomy, generator load, load steps and fuel duration are checked against the manufacturer curves and limits you enter.

  • Every result opens with its inputs, method and source.

Reliability and availability

Availability and reliability are estimated from defined independent components and their MTBF/MTTR inputs. The components and assumptions included are shown with the result. Read together with the failure scenarios, the estimate explains the difference between alternatives.

    Standards pre-assessment

    There are 33 pre-assessment packs: four Tier topology self-checks, four TIA-942 Rated targets, 24 packs for the EN 50600 and TS EN 50600 power supply, power distribution and environmental control classes, and one fire-protection review list. Each finding shows the equipment concerned, the reasoning and the pack version.

    • Missing inputs and items needing review are listed separately.
    • Manual decisions are linked to the revision with reasoning and evidence.

    Standards packs come with the paid plans. They are for pre-assessment during design and do not replace a certification audit.

    Unknown findings filter in the standards workspace.
    Findings with unknown status, filtered.
    Open the image to inspect the detail.

    Delivery

    Alternatives and cost study

    Compare N, N+1, 2N and block-redundant designs on the same project inputs. Installed capacity, failure results and engineering findings appear alongside low, typical and high CAPEX scenarios. TCO, net present value and CO₂e from purchased electricity are calculated from equipment quantities, your own unit prices and energy, maintenance and replacement inputs.

    Equipment costs and lifecycle assumptions.
    Cost study built from the design’s equipment quantities.
    Open the image to inspect the detail.
    • The chosen alternative becomes the working design.
    • Unpriced items and cost scope are shown.

    Deliverables

    Panel, cable, equipment and rack-load schedules are generated from the design data and handed to the project team as a PDF calculation report, an Excel workbook, a DXF layout and an IFC4 model of spaces and equipment. Every output carries the revision it came from; comments and review decisions are stored with that revision.

    • Calculations, schedules and layout are delivered from the same revision.

    DCIM hand-off

    Export locations, cabinets, equipment and connections as a generic CSV and Excel package. Map columns to your DCIM template and review unknown values in the validation report. The dcTrack and Nlyte profiles are starter mappings to verify against the template for your version.

    API and DCIM hand-off

    BIM handover with IFC4

    Equipment is exported to IFC4 with the appropriate IFC classes and property sets, and with storeys and spaces in their hierarchy. The output is intended for coordination at concept and design-development stage.

    Building shell import

    Storeys, spaces, walls, columns, slabs and doors are imported from IFC2x3 or IFC4. GlobalIds are preserved, and changes coming back from Revit are shown for your approval. Unsupported geometry stays as an underlay. Try the Revit round trip with your own model on a first project.

    Drawing exchange with DXF

    DXF underlays are imported, and closed boundaries you select become spaces once you confirm them. Layered 2D geometry is exported as R2013 DXF. Drawings are at layout level, without construction detail. The standard distribution has no DWG converter.

    Free calculators

    Ten calculators are open to everyone: capital cost, PUE and energy, UPS runtime, cooling, rack count and area, N+1 and 2N, carbon, free cooling by location, battery TCO and generator sizing. Each one shows its formula, assumptions and sources.

    To evaluate SoSo CAD on your own project, get in touch.