Design validation for failure and maintenance

Apply equipment loss, maintenance states or combined events of your choice to the model. A/B load transfer, de-energised racks and overloaded components are calculated. Shared rooms, sources and cooling dependencies let you test the redundancy decision.

Failure and maintenance scenarios

Apply equipment loss, maintenance states or combined events of your choice to the model. A/B load transfer, de-energised racks and overloaded components are calculated. Shared rooms, sources and cooling dependencies let you test the redundancy decision.

  • A single-failure sweep lists the affected loads.
  • The effect of a power loss on cooling is shown.
Failure and maintenance scenarios

Electrical calculations

Voltage drop is calculated from cable route and load. For a selected single-transformer radial circuit, short-circuit current is compared with the breaking capacity of the breaker at that point. UPS autonomy, generator load, load steps and fuel duration are checked against the manufacturer curves and limits you enter.

  • Every result opens with its inputs, method and source.

Cooling, energy and water

Required airflow is calculated from sensible heat, and inlet conditions are compared with the selected ASHRAE A1–A4 class. Free-cooling hours come from the site’s climate data; PUE and WUE are estimated from annual energy and water inputs. Missing climate, energy or water data is marked unknown.

  • Screen rack orientation, containment gaps, reach and airflow risks on the plan.
  • Hand off generic CSV/JSON and, when licensed, IFC4 to CFD tools.

Reliability and availability

Availability and reliability are estimated from defined independent components and their MTBF/MTTR inputs. The components and assumptions included are shown with the result. Read together with the failure scenarios, the estimate explains the difference between alternatives.