Capital cost (CAPEX)
Turn a capacity target into a feasibility-stage budget, split into base allowance, contingency and total.
Ten calculators for feasibility and early design. Change the inputs to match your project; the formula, default values and sources sit below every result.
The calculators are open to everyone and independent of any manufacturer. Inputs are not sent to a server.
Turn a capacity target into a feasibility-stage budget, split into base allowance, contingency and total.
Calculate annual IT energy, facility energy and electricity cost from IT load, utilisation and an assumed PUE.
Calculate battery runtime at a given UPS output load by interpolating between two load–runtime points from the manufacturer’s data.
Calculate the total heat load and the number of duty and standby units at your chosen unit capacity.
Calculate rack count, white space and total facility area from IT load and rack density.
Compare the module count and installed capacity needed to serve the same load with N+1 and with 2N.
Calculate CO₂e from purchased electricity using annual consumption and an emission factor.
Calculate how many hours a year outdoor temperatures allow free cooling at your location, from NOAA 2024 hourly data.
Compare the total cost and present value of Li-ion and VRLA battery offers that cover the same load and autonomy.
Calculate the continuous demand on the generator in kW and kVA, including UPS losses, battery recharge and auxiliaries.
The personal plan is free for individual use and includes one project, with guided design, layout, basic power and cooling calculations, and N+1 and 2N comparison.
Once a month: newly added sources, changes to Turkish regulations and upcoming data centre events.