Cooling capacity
Calculate the total heat load and the number of duty and standby units at your chosen unit capacity.
Result
Select Calculate to see the result.
Method
- Heat load = IT load / UPS efficiency + other heat. UPS loss = IT load × (1 / efficiency − 1).
- Duty units = round up(heat load / unit capacity). Installed units = duty + standby.
Assumptions and limits
UPS losses are assumed to fall in the same cooling zone; if the UPS has its own room, split the loads by zone. 96% UPS efficiency, 20 kW of other heat and 100 kW units are example inputs.
Take unit capacity from the manufacturer as net sensible capacity at the design supply and return temperatures. This is a capacity balance; airflow, pipework, pumps and part-load behaviour are assessed separately.
The same calculation in the design model
In SoSo CAD heat loads are tied to zones, cooling units and their power supplies, and the remaining capacity is checked when a unit or supply is lost.
The personal plan is free. Detailed studies and IFC, DXF and PDF deliverables come with the paid plans.