Capital cost (CAPEX)

Turn a capacity target into a feasibility-stage budget, split into base allowance, contingency and total.

Inputs

0.01 kW–10,000,000 kW
0 USD/kW–1,000,000,000 USD/kW
0%–100%

Result

Select Calculate to see the result.

Method

  1. Base allowance = IT load × capital cost per kW.
  2. Contingency = base allowance × contingency rate. Total = base allowance + contingency.

Assumptions and limits

The default USD 10,000/kW is a historical facility benchmark recorded in SoSo CAD and should not be read as a current market price. The 15% contingency is an example input.

Land, building, IT hardware, taxes, exchange rates and regional price differences are not modelled separately. Choose a unit cost with the same scope boundary as the offer you are comparing.

The same calculation in the design model

In SoSo CAD the capital budget is built from the design’s equipment list and price bands, and the same data feeds the TCO study.

The personal plan is free. Detailed studies and IFC, DXF and PDF deliverables come with the paid plans.

Data centre events and new resources

Once a month: newly added sources, changes to Turkish regulations and upcoming data centre events.