Method

  1. N = round up(load / (module rating × utilisation limit)).
  2. N+1 = N duty modules plus one standby. 2N = two independent N paths, each able to carry the full load.

Assumptions and limits

Modules are assumed identical with balanced load sharing. N+1 is checked with one module out, 2N with one whole path out. The 100% limit is SoSo CAD’s starting value, not a recommended operating target.

The result is an installed-capacity comparison. A/B independence, common failure points, transfer time and concurrent maintenance are assessed separately; availability or Tier assessment needs failure scenarios.

The same calculation in the design model

In SoSo CAD N+1, 2N and block-redundant options are designed for the same load and compared through failure scenarios on the design’s power paths.

The personal plan is free. Detailed studies and IFC, DXF and PDF deliverables come with the paid plans.

Data centre events and new resources

Once a month: newly added sources, changes to Turkish regulations and upcoming data centre events.