UPS battery runtime

Calculate battery runtime at a given UPS output load by interpolating between two load–runtime points from the manufacturer’s data.

Inputs

0.01 kW–1,000,000,000 kW
0.01 kW–1,000,000,000 kW
0 min–1,000,000,000 min
0.01 kW–1,000,000,000 kW
0 min–1,000,000,000 min
0.01%–100%

Result

Select Calculate to see the result.

Method

  1. t = t₁ + (t₂ − t₁) × (P − P₁) / (P₂ − P₁), with P₁ < P₂ and t₁ ≥ t₂.
  2. Result = t × retained capacity. The curve is not extrapolated; if P lies outside the two points the result is shown as unknown.

Assumptions and limits

The 50 kW / 20 min and 100 kW / 10 min points and the 80% retained capacity are examples. Use the manufacturer’s curve for one temperature and end-of-discharge voltage, and reflect battery age in the retained capacity.

The method is the same linear interpolation SoSo CAD uses for battery autonomy. If the curve is given against AC output load, do not apply UPS efficiency again. Discharge is nonlinear, so the closer the two points, the more accurate the result.

The same calculation in the design model

In SoSo CAD runtime is calculated for each UPS using the load share it carries in normal operation and in each failure scenario.

The personal plan is free. Detailed studies and IFC, DXF and PDF deliverables come with the paid plans.