Light + Building
About the event
Biennial leading trade fair for lighting, electrical installation and building automation, aimed at electrical designers and building technology professionals (next edition 5-10 March 2028).
Venue
This event has ended. The page is kept in the archive with its details and related technical reading.
Read before you go
Explore the librarySchneider Electric 2012
Data Center Projects: Growth Model
Capture the IT load profile at project setup as four fields (initial kW, minimum final kW, maximum final kW, ramp-up years, default lifetime 10 years), not one design load.
- kW = BTU/hr x .000293 and kW = tons x 3.52; each IT watt becomes a watt of heat, so the cooling profile equals the load profile.
Socomec 2024
Data centre - How to ensure power availability, electrical safety and energy performance? (Expert advice & innovative solutions guide)
In the single-line editor, tag transfer devices as ATSE (IEC 60947-6-1) or STS with a transfer-time field, and suggest STS where the load needs under about 10 ms.
- Human error accounts for 22 % of unplanned outages.
Lawrence Berkeley National Laboratory 2025
DOE Data Center Load Flexibility Workshop Summary
Add a demand-flexibility scenario to the energy model: curtailable IT share and on-site generation or BESS dispatch.
- Workshop held 1 November 2024 with 49 participants.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo