2015 ASHRAE Handbook-HVAC Applications, Chapter 19: Data Centers and Telecommunication Facilities

ASHRAE · ASHRAE TC 9.9

The data center chapter of the ASHRAE handbook, covering the Datacom Series books, workload and airflow nomenclature, liquid-cooled equipment definitions and contamination concerns.

On this page

Overview

This document is Chapter 19 of the 2015 edition of the ASHRAE Handbook - HVAC Applications, prepared by TC 9.9. It introduces core design concepts for data centers and telecommunication facilities and briefly describes each book of the Datacom Series. At the time the series comprised 11 books produced by TC 9.9.

The content covers datacom equipment workload, rack and airflow nomenclature, liquid-cooled equipment definitions and contamination concerns. When rack counts are unknown early on, it notes that professional judgement is needed between kilowatts per rack and watts per square metre. Front-to-rear airflow nomenclature has been unchanged since 2004. Gaseous contaminants of concern include H2S, SO2, mercaptans, NOx, chlorine and ozone.

Only metadata from the catalogue and handbook descriptions was used here; the chapter itself was not read.

Key points

  1. The Datacom Series then comprised 11 books produced by TC 9.9.
  2. When rack counts are unknown early, professional judgement is needed between kW/rack and W/m2.
  3. Front-to-rear airflow nomenclature has been unchanged since 2004.
  4. Gaseous contaminants of concern: H2S, SO2, mercaptans, NOx, chlorine, ozone.
  5. The chapter covers datacom equipment workload and rack nomenclature.
  6. Liquid-cooled equipment definitions are included.

Using it in design

  • Support both W/m2 and kW/rack modes in early-stage load entry.
  • Define equipment airflow direction as front-to-rear consistent with the cold aisle and hot aisle layout.
  • On sites with ambient pollution risk, take gaseous contaminants (H2S, SO2 and so on) into account in air filtration and material choices.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Check cooling capacity alongside your design

Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.

Request a demo
Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Who should read it

Data center mechanical designers and engineers doing early-stage capacity planning.

Publication details

Authors
ASHRAE TC 9.9
Publisher
ASHRAE
Year
2015
Document number
HVAC Applications 2015 Ch. 19
Document language
English
Source type
Standard
Access
Citation only
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Copyrighted ASHRAE book sold via ASHRAE Bookstore (and TC 9.9 Datacom Encyclopedia subscription). Not read; metadata from ASHRAE catalogue / Handbook descriptions only. Citation only.

Citation

ASHRAE TC 9.9 (2015). 2015 ASHRAE Handbook-HVAC Applications, Chapter 19: Data Centers and Telecommunication Facilities. ASHRAE. HVAC Applications 2015 Ch. 19. https://handbook.ashrae.org/Handbooks/A15/SI/a15_ch19/a15_ch19_si.aspx

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.