StandardFree to read2023

2023 ASHRAE Handbook: HVAC Applications, Chapter 20, Data Centers and Telecommunication Facilities

ASHRAE

The chapter discusses data-center cooling and reproduces the 2021 thermal equipment classes. It shows that temperature alone is not enough to evaluate the inlet envelope; moisture and altitude must be checked together.

On this page

Overview

Chapter 20, in its SI edition, discusses data-center cooling approaches and includes the classes of ASHRAE Thermal Guidelines for Data Processing Environments (fifth edition, 2021). The environmental table combines dry-bulb temperature, moisture and altitude conditions, so looking at temperature alone does not tell you whether a server inlet is inside the envelope. A one-line requirement such as a maximum inlet temperature is therefore not enough; moisture and dew point are assessed in the same table.

Table 1 defines each air-cooled equipment class using temperature, noncondensing humidity, dew point and elevation limits. Its footnotes require an altitude adjustment to the maximum dry-bulb temperature: at a high site the permitted upper temperature is lower than at sea level. All conditions must be satisfied together. The same equipment class can therefore have two different maximum temperatures depending on the site; the class name alone is not enough information.

The copyrighted handbook is linked, not redistributed. The document defines the allowable envelope; it does not recommend operating continuously at the boundary of that envelope. A designer should retain the class and altitude assumptions on record and not reduce the environment to a single temperature threshold. Because the chapter reproduces the 2021 classes, it should be read together with the fifth-edition Thermal Guidelines, where the detailed class tables sit.

Key points

  1. The chapter reproduces the 2021 thermal equipment classes.
  2. Table 1 defines each air-cooled class by temperature, noncondensing humidity, dew point and elevation limits.
  3. Footnotes require an altitude adjustment to maximum dry-bulb temperature.
  4. Temperature alone is insufficient to evaluate the inlet envelope.
  5. Related document: ASHRAE Thermal Guidelines for Data Processing Environments, fifth edition (2021).

Using it in design

  • Evaluate all applicable inlet conditions (temperature, moisture, dew point, altitude) together.
  • Retain class and altitude assumptions in the design record.
  • Do not present passing an allowable-envelope check as a recommendation to run continuously at its boundary.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Check cooling capacity alongside your design

Review zone heat loads, available capacity and the capacity balance after the largest unit is lost in SoSo CAD.

Request a demo
Zone heat loads and capacity balance in the SoSo CAD cooling workspace

Who should read it

Mechanical designers setting server inlet conditions and the cooling design envelope.

Related standards

  • ASHRAE Thermal Guidelines for Data Processing Environments, fifth edition (2021)

Publication details

Authors
ASHRAE
Publisher
ASHRAE
Year
2023
Document number
2023 HVAC Applications, Chapter 20 (SI)
Document language
English
Source type
Standard
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

ASHRAE (2023). 2023 ASHRAE Handbook: HVAC Applications, Chapter 20, Data Centers and Telecommunication Facilities. ASHRAE. 2023 HVAC Applications, Chapter 20 (SI). https://handbook.ashrae.org/Handbooks/A23/SI/A23_Ch20/A23_Ch20_si.aspx

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.