Powering Single-corded Equipment in a Dual Path Environment
Schneider Electric · Victor Avelar
Victor Avelar's paper compares three ways to feed single-corded IT loads in a 2N power architecture and recommends rack-mount ATS units below 10 kVA.
On this page
Overview
The three options are a single feed, a point-of-use transfer switch in the rack, or a large centralised static transfer switch (STS) that creates a new bus. Single-corded equipment still makes up about 10-20% of IT equipment in mission-critical facilities; per WP 48, a 100% dual-corded data centre with independent paths can have 10,000 times less downtime than a single-path design. The paper explains how static (SCR-based) and electromechanical (relay-based) switches work and how they fail.
The failure modes are the paper's most distinctive part: SCRs fail short 98% of the time, and a shorted SCR differs from a good one by typically less than 0.5 volts, which makes detection hard. Timing comes from the ITIC (CBEMA) curve: IT equipment keeps running for 20 milliseconds at zero volts, so any switch must transfer in 20 ms or less; a heavily loaded power supply tested held its output for 18 ms. An STS transfers in about 4 ms, an electromechanical ATS in 8 to 16 ms.
The reliability argument is built on numbers. Relays are typically rated for 100,000 operations, while data-centre transfer switches see on average four transfers a year. STS units range from 5 kVA to 35 MVA, most in the 100-300 kVA range with a footprint of about two IT racks. Indicative TCO is $200-300/kW for a large STS, $550-700/kW for a rack STS and $100-150/kW for a rack ATS; MTBF estimates are 400,000-1,000,000 h for STS against 700,000-1,500,000 h for rack ATS. The conclusion is rack ATS below 10 kVA.
Key points
- Single-corded gear is about 10-20% of IT equipment in mission-critical sites; a 100% dual-corded site with independent paths can have 10,000 times less downtime than single-path (per WP 48).
- STS units range from 5 kVA to 35 MVA, most 100-300 kVA with a footprint of about two IT racks; rack-mount STS are 5-10 kVA.
- STS switching takes about 4 ms and electromechanical ATS 8 to 16 ms; rack ATS rarely switch beyond 10 kVA.
- SCRs fail short 98% of the time, and a shorted SCR differs from a good one by typically under 0.5 V, so detection is hard.
- Per the ITIC (CBEMA) curve IT equipment runs 20 ms at zero volts, so a switch must transfer in 20 ms or less; a heavily loaded PSU held output for 18 ms.
- Relays are typically rated for 100,000 operations while data-centre transfer switches average four transfers a year.
- Indicative TCO: large STS $200-300/kW, rack STS $550-700, rack ATS $100-150; MTBF 400,000-1,000,000 h for STS vs 700,000-1,500,000 h for rack ATS.
Using it in design
- Record the cord count (single or dual) of each IT device in the rack model and compute the single-corded share.
- In a 2N design, warn when a single-corded device is connected to only one path and suggest a rack ATS for 10 kVA or less rather than a central STS.
- Give transfer switch catalogue entries type (STS, ATS), kVA, transfer time in ms, MTBF and mounting (rack, floor), and require a transfer time of 20 ms or less for IT loads.
- In availability calculations treat a large STS as a common-mode element feeding many racks and show its blast radius.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers and availability analysts feeding single-corded devices in 2N power architectures.
Related standards
- ITIC (CBEMA) curve
- IEC 61000-4-11
Publication details
- Authors
- Victor Avelar
- Publisher
- Schneider Electric
- Year
- 2011
- Document number
- WP 62
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Victor Avelar (2011). Powering Single-corded Equipment in a Dual Path Environment. Schneider Electric. WP 62. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_SADE-5TNRLE_EN
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.