White paperFree to read2016

Analysis of Data Center Architectures Supporting Open Compute Project (OCP)

Schneider Electric · Kevin Brown, Wendy Torell

A Schneider Electric white paper (WP 228, 2016) that costs reference designs for a 9.6 MW, 10 kW/rack facility to show what Open Compute racks with rack-level power shelves and battery backup units mean for the upstream electrical system.

On this page

Overview

The paper examines what Open Compute racks, with consolidated rack-level power shelves and battery backup units (BBUs), mean for the electrical system upstream of the rack. Costed reference designs for a 9.6 MW, 10 kW/rack facility compare a traditional 2N (tier 3) design, an OCP-specific 1N design, an OCP-specific 2N design with no central UPS, and a simplified 2N design keeping one UPS-backed path so traditional and OCP loads can coexist. The cost basis is actual project costs normalised in EUR/W from MV switchgear through the server power supplies.

Relative to traditional 2N, OCP-specific 1N saves 45% of capex and OCP-specific 2N saves 25%; the simplified mixed-load 2N carries a 3% premium over OCP-specific 2N. Simplified 2N with 100% OCP loads is 1.95 EUR/W, adding 0.21 EUR/W for 100% traditional loads. In the waterfall from traditional 2N to OCP 1N, removed redundancy saves 0.79 EUR/W (31%), UPS removal 0.20 EUR/W (8%) and server PSU consolidation 0.31 EUR/W (12%), against a 0.14 EUR/W (5%) premium for rack BBUs. Architecture simplification (no cross-ties, extra breakers, load bank or second UPS) accounts for 0.36 EUR/W, 14 of the 25 percentage points saved by OCP 2N, independent of load type.

PSU cost per IT watt is 0.07 EUR x redundancy 2 x oversizing 3 = 0.42 EUR for traditional, versus (0.06 + 0.03 shelf) x 1.2 = 0.11 EUR (1N) or 0.22 EUR (2N) for OCP. Varying traditional PSU oversizing from 2 to 4.5 gives a premium of 5-15% at a 50/50 load mix and 8-26% at 100% traditional load. Battery assumptions are VRLA, 5 min, centralised in the UPS for traditional and lithium-ion, 4 min, rack-based for OCP, both at 25 C. Li-ion stores the same energy in about one third of the footprint and weight of VRLA, enabling rack-level batteries. The paper adds that battery chemistry should be considered separately from battery location and tabulates pros and cons of central versus rack-level storage.

Key points

  1. Reference: 9.6 MW at 10 kW/rack; cost from MV switchgear to server PSUs in EUR/W.
  2. Capex versus traditional 2N: OCP-specific 1N saves 45%, OCP-specific 2N saves 25%.
  3. Simplified mixed-load 2N costs a 3% premium over OCP-specific 2N.
  4. Simplified 2N with 100% OCP loads is 1.95 EUR/W; +0.21 EUR/W for traditional loads.
  5. Waterfall 2N to OCP 1N: redundancy removal 0.79 EUR/W (31%), UPS removal 0.20 (8%), PSU consolidation 0.31 (12%) savings; rack BBUs 0.14 (5%) premium.
  6. Architecture simplification is 0.36 EUR/W, 14 of OCP 2N's 25 points.
  7. PSU cost per IT watt: traditional 0.42 EUR; OCP 0.11 (1N) or 0.22 EUR (2N).
  8. Li-ion stores the same energy in about one third of VRLA's footprint and weight.

Using it in design

  • Offer reference architectures 'traditional 2N', 'OCP 1N', 'OCP 2N (no central UPS, 1N BBU)' and 'simplified 2N mixed-load (single UPS path)' in the topology builder; let a rack type declare power shelf, BBU runtime and PSU redundancy.
  • Flag OCP 1N as not concurrently maintainable; when OCP racks have no BBU require an upstream UPS on at least one path.
  • Warn when the declared tier or redundancy target conflicts with the chosen topology.
  • In the capex calculator break costs into MV/LV/pod/rack levels, make server PSU cost and oversizing user inputs, and show savings from removing cross-ties, load banks and the second UPS as a separate line.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical designers and investment decision makers evaluating OCP or rack-level power architectures.

Related standards

  • OCP Open Rack
  • Uptime Institute Tier Standard: Topology
  • ANSI/TIA-942

Publication details

Authors
Kevin Brown; Wendy Torell
Publisher
Schneider Electric
Year
2016
Document number
WP 228
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Kevin Brown; Wendy Torell (2016). Analysis of Data Center Architectures Supporting Open Compute Project (OCP). Schneider Electric. WP 228. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_VAVR-A5AJW3_EN

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.