WP#51 - Power Equipment and Data Center Design
The Green Grid · David Loucks, Stephen McCluer et al.
A Green Grid guide to designing an efficient data centre power system, covering configurations and how a facility is grown over time.
On this page
Overview
WP#51 is a Green Grid guide dated 15 November 2012 on designing an efficient data centre power system. Its editors are David Loucks (Eaton) and Stephen McCluer (Schneider), and many authors contributed to it. Access requires signing in with a free Green Grid account; this record rests only on the abstract on the public library page, and the full text was not read.
The guide covers power system configurations and how a data centre is grown over time. This matches the real situation in which a facility is built in stages rather than at full capacity at once. Staged growth means equipment runs at partial load at each stage, so efficiency has to be considered at every load step and not only at full load.
The document details the power system components and the measurement and control points for each. It also provides implementation timetables for each component as a quick reference for the designer. Defining measurement points component by component bears directly on the question of which points to use when measuring PUE. This helps the design consider measurability from the start. Defining measurement points per component makes it possible to track the power chain's efficiency part by part and to see how much each component contributes to losses.
The record contains no numerical findings or component-level detail; these appear only in the full text and are not given here. The document dates from 2012, so it is best read as a reference for configuration and measurement logic rather than for current product features. Its most concrete value for a designer is the reminder to plan power chain components together with their measurement and control points.
Key points
- The guide is dated 15 November 2012; editors are David Loucks (Eaton) and Stephen McCluer (Schneider).
- It covers power system configurations and how a data centre is grown over time.
- It details power system components and their measurement and control points.
- It provides implementation timetables for each component as a quick reference.
- Many authors contributed to the document.
- Staged growth makes part-load efficiency important at each stage.
- Access requires a free account sign-in; this record rests on the public page abstract.
Using it in design
- In phased-build planning, support staged UPS and generator modules with efficiency at each load step.
- Place metering points per component; they feed the PUE measurement category.
- Match the component implementation timetables to the project commissioning plan.
- When comparing power chain configurations, also evaluate the facility's part-load operation in the first phase.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical engineers designing efficient power systems and planners of phased data centre capacity.
Publication details
- Authors
- David Loucks; Stephen McCluer; Lynn Simmons; John Collins; George Navarro; Dusty Becker; Bill Campbell; Harry Handlin; Mark Szalkus; Brad Thrash; Pamela Lembke; Kevin Bross; Shaun Harris; Jim Spitaels
- Publisher
- The Green Grid
- Year
- 2012
- Document number
- WP 51
- Document language
- English
- Source type
- Industry body
- Access
- Citation only
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note
Download requires a free TGG account sign-in and is governed by The Green Grid Terms of Use; summary and facts from the public library landing page; full text not redistributed.
Citation
David Loucks; Stephen McCluer; Lynn Simmons; John Collins; George Navarro; Dusty Becker; Bill Campbell; Harry Handlin; Mark Szalkus; Brad Thrash; Pamela Lembke; Kevin Bross; Shaun Harris; Jim Spitaels (2012). WP#51 - Power Equipment and Data Center Design. The Green Grid. WP 51. https://www.thegreengrid.org/en/resources/library-and-tools/382-WP%2351---Power-Equipment-and-Data-Center-Design
Events on this subject
- Electricity Eurasia 2027
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
- The smarter E Europe (Intersolar Europe, ees Europe, Power2Drive, EM-Power)
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.