CONTEG PDU datasheet: monitored IP-SCI and managed IP-SCA
CONTEG
CONTEG rack PDU datasheet: separates the basic, monitored (IP-S*I) and managed (IP-S*A) families by input metering, per-outlet metering (POM) and outlet switching.
On this page
Overview
CONTEG's PDU datasheet presents three types of rack power distribution unit for high-density IT environments: basic PDUs, monitored PDUs that report current and energy over the network, and managed PDUs that add remote switching of individual outlets. In the type code the asterisk is replaced by C for controller module, G for gateway module or D for daisychain module.
The comparison table shows that basic PDUs have no metering or SNMP, while monitored and managed families provide input metering of V, A, f, PF, kVA, kW and kWh with SNMP. POM (per outlet monitored) versions meter every outlet separately; managed units can also switch outlets. The IP-SCI and IP-SCA tables separate the monitored and managed configurations.
Basic PDU outputs can be UTE, SCHUKO, UK, IEC320 C13 and C19; maximum load is 16 A 250 V for SCHUKO/UTE and C19, 13 A for UK and 10 A for C13. Height is 44 mm, depth 48 or 50 mm; input is 1-phase 230 V or 3-phase 230/400 V, 16 or 32 A, with a 3 m cable. Monitored and managed PDUs are 65 mm high and 52.6 mm deep in anodised aluminium; measurement error is below 1%, operating temperature 0-60 C and consumption below 3 W.
Monitored and managed units carry an illuminated LCD, 2 x RJ45 RS-485 data bus, Ethernet (TCP/IP 10/100, DHCP, SNMP, Modbus, API), a temperature and humidity sensor port, a built-in web server and optional hot-swap overvoltage protection. Versions with a C20 input need supply cables ordered separately. Example IP-SCI models have 1 x 16 A, 1 x 32 A, 3 x 16 A, 3 x 32 A and 3 x 63 A inputs with 8-36 outlets.
Key points
- Three classes: basic (no metering), monitored (input metering) and managed (input metering and outlet switching).
- POM code: every outlet metered separately; managed POM also controls outlets.
- Metered values: V, A, f, PF, kVA, kW and kWh; measurement error below 1%.
- Basic PDU maximum load: SCHUKO/UTE and C19 16 A 250 V; UK 13 A; C13 10 A.
- Monitored/managed: 65 mm height, 52.6 mm depth, 0-60 C, below 3 W consumption.
- Network: TCP/IP 10/100 Mb/s, DHCP, SNMP, Modbus, API and built-in web server.
- C20-input variants need separately ordered supply cables; 63 A EN 60309 PDUs ship without brackets.
- Standard colour black; blue, red, green, yellow, orange and white by suffix.
Using it in design
- Choose the metering level per cabinet: IP-S*I for input monitoring only, POM for per-outlet energy, IP-S*A for remote reboot.
- Match the input plug (C20 or EN 60309, 16/32/63 A, 1 or 3 phase) to the feed to the rack and list the required cables separately.
- Set outlet type and count (C13, C19) from server power supplies and check each outlet's current limit.
- Carry SNMP, Modbus and API integration into the DCIM or BMS plan.
- Match the ordering revision to this document; older catalogues use different model prefixes.
Who should read it
Electrical and IT infrastructure engineers planning rack power distribution and DCIM integration.
Document contents
- Overview of PDU types
- Basic power distribution units
- Monitored power distribution units
- Managed power distribution units
Publication details
- Authors
- CONTEG
- Publisher
- CONTEG
- Year
- Year not stated
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Public manufacturer document. Metadata and original short summary only; no full text reproduced in library.
Citation
CONTEG CONTEG PDU datasheet: monitored IP-SCI and managed IP-SCA. CONTEG. https://www.conteg.com/userfiles/pdu-datasheet-conteg-en-ce4cae8a.pdf?v=
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.