ASHRAE's energy standard for data centers turns three
Consulting-Specifying Engineer · Bill Kosik
Bill Kosik's practitioner guide to ASHRAE 90.4-2016 three years after release, explaining its two compliance metrics (MLC and ELC), trade-off provisions and the proposed 2019 addenda.
On this page
Overview
In this 2019 article in Consulting-Specifying Engineer, Bill Kosik looks at ASHRAE Standard 90.4-2016 from a practitioner's view three years after its release. He explains its relationship to 90.1 and its two compliance metrics: the mechanical load component (MLC) and the electrical loss component (ELC).
Design MLC is the sum of cooling, pump, heat-rejection fan and AHU fan design power divided by design ITE power, checked at 100% and 50% ITE load against Table 6.2.1. Annualized MLC requires an hourly energy simulation, also checked at 100% and 50% ITE load. ELC covers incoming service, UPS and ITE distribution: single-feed (N, N+1) UPS is evaluated at 100%/50% load and active dual-feed (2N, 2N+1) at 50%/25%. Separate ELC tables apply for ITE loads under 100 kW and 100 kW and above, and mechanical distribution losses are limited to 2%. Annualized air-system MLC values assume a 20 F supply-air temperature rise and 85 F return air.
The author also describes the trade-off and renewable-offset provisions and the proposed 2019 addenda that would drop design MLC, tighten limits and switch to a four-point annualized MLC. In the proposal, annualized MLC is computed over 25/50/75/100% ITE load, with ITE energy at X% equal to design ITE load x 8,760 h x X%. Kosik cautions that IT power does not scale linearly with computational load. For compliance, consult the standard's edition in force and the edition adopted by the jurisdiction.
Key points
- Design MLC = (cooling + pump + heat-rejection fan + AHU fan design power) / design ITE power, checked at 100% and 50% ITE load against Table 6.2.1.
- Annualized MLC requires an hourly energy simulation, also checked at 100% and 50% ITE load.
- ELC covers incoming service, UPS and ITE distribution; single-feed (N, N+1) UPS is evaluated at 100%/50%, active dual-feed (2N, 2N+1) at 50%/25% load.
- Separate ELC tables apply for ITE loads under 100 kW and 100 kW and above; mechanical distribution losses are limited to 2%.
- Annualized air-system MLC values assume a 20 F supply-air temperature rise and 85 F return air.
- Proposed 2019 addenda: annualized MLC over 25/50/75/100% ITE load, with ITE energy at X% = design ITE load x 8,760 h x X%.
- The proposed addenda would drop design MLC and tighten limits.
- The author cautions that IT power does not scale linearly with computational load.
Using it in design
- Use the ASHRAE 90.4 MLC and ELC test load points appropriate to the UPS redundancy class (N/N+1 or 2N).
- Assess the 20 F delta-T and 85 F return assumptions as editable inputs and flag when a design deviates.
- Check which edition (2016 or later) the user's jurisdiction adopts.
- Do not scale IT power linearly with computational load; use real equipment data at part-load points.
Who should read it
Mechanical and electrical designers calculating data centre energy compliance, and energy modellers.
Related standards
- ASHRAE 90.4-2016
- ASHRAE 90.1-2016
Publication details
- Authors
- Bill Kosik
- Publisher
- Consulting-Specifying Engineer
- Year
- 2019
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Citation
Bill Kosik (2019). ASHRAE's energy standard for data centers turns three. Consulting-Specifying Engineer. https://www.csemag.com/ashraes-energy-standard-for-data-centers-turns-three/