Fast Frequency Response Potential of Data Centers Through Workload Modulation and UPS Coordination
IEEE Access (Institute of Electrical and Electronics Engineers (IEEE)) · Xiaojie Tao, Rajit Gadh
A 20 MW data centre added to the IEEE 39-bus system uses two fast frequency-response channels, droop-controlled UPS battery discharge and IT-server power reduction through CPU throttling, to raise the frequency nadir after a 200 MW generator trip.
CC BY 4.0: share with attribution
On this page
Overview
The study asks whether data centres can help stabilise frequency in low-inertia systems thanks to controllable IT workloads and on-site UPS systems. A dynamic model combining data-centre power consumption and grid frequency dynamics was developed; frequency-deviation control strategies adjust server power and discharge UPS batteries during frequency events. The 20 MW data centre is integrated at Bus 18 in Area 1 of the IEEE 39-bus system.
Model parameters: server droop gain 10 MW/Hz, UPS droop gain 15 MW/Hz (aggregate 25 MW/Hz), UPS energy 5 MWh, response time constant 0.1 s, discharge/charge efficiency 0.95/0.9, PUE 1.2, deadband ±0.03 Hz. The authors state UPS response time is typically below 100 ms. After a 200 MW generation trip (H = 2 s), the nadir was 59.66 Hz with no data-centre response, 59.78 Hz with UPS only and 59.85 Hz with coordinated UPS + IT response; recovery was about 1.6 s faster.
In the coordinated case the UPS discharged up to +8 MW within 0.2 s while IT throttling cut 4 MW; measured total response latency was 0.15 s. The coordinated strategy cut nadir deviation by 57% and recovery time by 34%, with task delay below 2%. The paper says UPS batteries can sustain multiple FFR activations per hour without compromising backup if SOC is kept within 20-80%.
Limits: the model is idealised (a first-order data-centre block) and some reported energy figures are inconsistent: the 1.65 MWh (33.3% of 5 MWh) discharged in the first 10 s does not match the stated ~8 MW peak discharge. Results rest on one disturbance scenario and one test system, with no validation on a real data centre.
Key points
- Model parameters: 20 MW data centre, server droop gain 10 MW/Hz, UPS droop gain 15 MW/Hz (aggregate 25 MW/Hz), UPS energy 5 MWh, response time constant 0.1 s, discharge/charge efficiency 0.95/0.9, PUE 1.2, deadband ±0.03 Hz.
- The authors state UPS response time is typically below 100 ms, suitable for the first stage of fast frequency response.
- After a 200 MW generation trip (H = 2 s), the nadir was 59.66 Hz with no response, 59.78 Hz with UPS only and 59.85 Hz with coordinated UPS + IT response; recovery was about 1.6 s faster.
- In the coordinated case the UPS discharged up to +8 MW within 0.2 s while IT throttling cut 4 MW; total response latency was 0.15 s.
- The coordinated strategy cut nadir deviation by 57% and recovery time by 34%, with task delay below 2%.
- The paper says UPS batteries can sustain multiple FFR activations per hour without compromising backup if SOC stays within 20-80%, but it also reports 1.65 MWh (33.3% of 5 MWh) discharged in the first 10 s, which does not match the stated ~8 MW peak.
Using it in design
- For a UPS that will provide grid services, define the SOC window (for example 20-80%) and show by calculation that backup autonomy is preserved inside it.
- Keep UPS droop and server throttling gains as separate control inputs, and verify response latency (0.15 s) and the task-delay limit (2%) together.
- Check that MW peak discharge and discharged MWh are consistent in your own energy budget, and do not repeat the inconsistency found in the paper.
Who should read it
Power-system engineers and data-centre energy managers evaluating UPS and workload flexibility for grid frequency services.
Document contents
- 1. Introduction
- 2. Fast Frequency Response (2.1 Concept and Motivation, 2.2 Power System Frequency Dynamics, 2.3 Primary and Fast Frequency Response Control, 2.4 Integration of Data-Center-Based FFR, 2.5 Analytical Insights)
- 3. Data Centers (3.1 Power Composition and Load Characteristics, 3.2 IT Server Load Modulation, 3.3 UPS Energy Storage Coordination, 3.4 Coordinated Control Strategy, 3.5 Integration into System Model)
- 4. Case Study (4.1 Test System Description, 4.2 Simulation Scenarios, 4.3 Parameter Configuration, 4.4 Performance Metrics, 4.5 Implementation Notes)
- 5. Simulation Results and Discussion (5.1 Frequency Response Performance, 5.2 Data Center Power Dynamics, 5.3 UPS State-of-Charge Evolution, 5.4 Sensitivity to Control Parameters, 5.5 Quantitative Performance Comparison, 5.6 Discussion)
- 6. Conclusion and Future Work
Related standards
- IEC 62040-3
- IEEE 1547
Read the document
dc-fast-frequency-response-ups-coordination-2025.pdf
CC BY 4.0: share with attribution
The document is provided unaltered because its licence permits redistribution.
Publication details
- Authors
- Xiaojie Tao; Rajit Gadh
- Publisher
- IEEE Access (Institute of Electrical and Electronics Engineers (IEEE))
- Year
- 2025
- Document number
- arXiv:2512.14128
- Volume
- 13
- Pages
- 214511-214519
- Document language
- English
- Source type
- Scientific
- Access
- Open licence (downloadable)
- Licence
- CC BY 4.0: share with attribution
- Licence evidence
- arxiv.org
Original licence note
The redistributed file is the arXiv version (arXiv:2512.14128v1), which arXiv's OAI-PMH record lists under http://creativecommons.org/licenses/by/4.0/; the IEEE Access version is also CC BY.
Citation
Xiaojie Tao; Rajit Gadh (2025). Fast Frequency Response Potential of Data Centers Through Workload Modulation and UPS Coordination. IEEE Access (Institute of Electrical and Electronics Engineers (IEEE)). arXiv:2512.14128. 13, 214511-214519. https://doi.org/10.1109/access.2025.3646120
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.