2025 data center progress report: Digital transformation and energy management in the wake of AI
Eaton
Eaton's 2025 report WP152032EN is a vendor publication covering data-centre operators' priorities for AI adoption, energy management, edge infrastructure and cybersecurity.
On this page
Overview
The report is a vendor study of data-centre operators' priorities for AI adoption, energy management, edge infrastructure and cybersecurity. The publisher is Eaton and the document number is WP152032EN.
The public report overview covers AI-assisted operations and energy and power priorities. The scope also includes security protocols for customer data and AI models.
Key points
- Publisher is Eaton; document number WP152032EN, year 2025.
- The report examines data-centre operators' priorities.
- Scope includes AI adoption and AI-assisted operations.
- Energy and power priorities are within scope.
- Security protocols for customer data and AI models are part of the report's scope.
Using it in design
- Map power and energy management priorities for AI workloads to design requirements and use operator priorities as a benchmark.
- Include edge infrastructure and cybersecurity requirements early in the design of power distribution and monitoring systems.
- Assess the priorities in vendor reports by comparing them with independent sources.
Who should read it
Data-centre designers and operations managers benchmarking AI and energy management priorities.
Publication details
- Authors
- Eaton
- Publisher
- Eaton
- Year
- 2025
- Document number
- WP152032EN
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Eaton landing page opened with TinyFish on 2026-11-16; footer states © 2026 Eaton. All Rights Reserved. A direct PDF download link is offered; no redistribution licence is stated. Publisher page opened successfully; summary and facts are limited to visible page content. Document year omitted when not explicitly established. License evidence: https://www.eaton.com/us/en-us/digital/brightlayer/brightlayer-data-centers-suite/2025-data-centers-progress-report.html
Citation
Eaton (2025). 2025 data center progress report: Digital transformation and energy management in the wake of AI. Eaton. WP152032EN. https://www.eaton.com/us/en-us/digital/brightlayer/brightlayer-data-centers-suite/2025-data-centers-progress-report.html
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.
