White paperFree to read2025

2025 data center progress report: Digital transformation and energy management in the wake of AI

Eaton

Eaton's 2025 report WP152032EN is a vendor publication covering data-centre operators' priorities for AI adoption, energy management, edge infrastructure and cybersecurity.

On this page

Overview

The report is a vendor study of data-centre operators' priorities for AI adoption, energy management, edge infrastructure and cybersecurity. The publisher is Eaton and the document number is WP152032EN.

The public report overview covers AI-assisted operations and energy and power priorities. The scope also includes security protocols for customer data and AI models.

Key points

  1. Publisher is Eaton; document number WP152032EN, year 2025.
  2. The report examines data-centre operators' priorities.
  3. Scope includes AI adoption and AI-assisted operations.
  4. Energy and power priorities are within scope.
  5. Security protocols for customer data and AI models are part of the report's scope.

Using it in design

  • Map power and energy management priorities for AI workloads to design requirements and use operator priorities as a benchmark.
  • Include edge infrastructure and cybersecurity requirements early in the design of power distribution and monitoring systems.
  • Assess the priorities in vendor reports by comparing them with independent sources.

Who should read it

Data-centre designers and operations managers benchmarking AI and energy management priorities.

Publication details

Authors
Eaton
Publisher
Eaton
Year
2025
Document number
WP152032EN
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Eaton landing page opened with TinyFish on 2026-11-16; footer states © 2026 Eaton. All Rights Reserved. A direct PDF download link is offered; no redistribution licence is stated. Publisher page opened successfully; summary and facts are limited to visible page content. Document year omitted when not explicitly established. License evidence: https://www.eaton.com/us/en-us/digital/brightlayer/brightlayer-data-centers-suite/2025-data-centers-progress-report.html

Citation

Eaton (2025). 2025 data center progress report: Digital transformation and energy management in the wake of AI. Eaton. WP152032EN. https://www.eaton.com/us/en-us/digital/brightlayer/brightlayer-data-centers-suite/2025-data-centers-progress-report.html

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Cost studies in SoSo CAD

Calculate equipment cost, energy cost and total cost of ownership (TCO) from the design’s quantities and your own price assumptions.

CAPEX and TCO estimates in the SoSo CAD cost workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.