Optimizing the Medium Voltage Data Center: How to attain infrastructure reliability and reduce energy usage

HITEC Power Protection

A HITEC Power Protection white paper arguing for diesel rotary UPS (DRUPS) and medium-voltage distribution over battery-based static UPS, calculating that a 5-minute battery for 400 kW needs about 200 sq ft of extra space.

On this page

Overview

The paper argues that most data-centre cost comes from space and power infrastructure, and that battery-based static UPS takes up space and is often the main cause of prolonged failures. It cites a Ponemon Institute survey: 91% of respondents had an unplanned data-centre outage, with UPS battery failure and human error the top causes.

Its cost example: a battery carrying a 400 kW load for five minutes needs roughly 200 sq ft of extra space and about $200,000 in construction cost, taking a minimum start-up cost of $1,000 per sq ft. Layers of redundancy, with stranded capacity, often leave owners with under 50% utilisation.

The proposed solution is a DRUPS that takes power at medium voltage (for example 2,400-35,000 V) and distributes at the same voltage. In the old chain medium voltage is stepped to 480 V and then down again at the PDU, and each layer adds cost and inefficiency. Medium-voltage distribution means fewer and smaller conductors, lower voltage drop and less heat; 4,160 V motors can serve cooling and 415/240 V or 480/208 V can serve tenants, stepping down where needed. The document is a vendor publication that promotes DRUPS.

Key points

  1. In a Ponemon Institute survey 91% of respondents had an unplanned data-centre outage; the top causes were UPS battery failure and human error.
  2. A 5-minute, 400 kW battery needs about 200 sq ft of extra space and about $200,000 in construction (at $1,000 per sq ft start-up cost).
  3. Layered redundancy often leaves owners with utilisation below 50%.
  4. The old chain: medium voltage (2,400-35,000 V), 480 V distribution, UPS, PDU to low voltage; each layer adds cost and inefficiency.
  5. DRUPS is presented as able to provide continuous, conditioned power at medium voltage.
  6. Medium-voltage distribution allows fewer and smaller copper conductors, lower voltage drop and less heat.
  7. In a properly redundant medium-voltage system, if a tenant uses under half its power the rest can be redistributed, lifting utilisation well above 50%, possibly above 75%.
  8. A maintained DRUPS lasts over 25 years and supplies high short-circuit current to clear load fuses.

Using it in design

  • In UPS selection, add battery-room space and construction cost (per sq ft or m2) explicitly to the total investment calculation.
  • Compare medium-voltage and 480 V distribution on conductor size, voltage drop and heat loss.
  • Record the stranded capacity created by redundancy layers (utilisation under 50%) in the capacity plan and explore load-sharing options.
  • Evaluate medium-voltage cooling motors (for example 4,160 V) and tenant-specific IT voltages in the single-line design.
  • The paper is a vendor view; request independent reliability data when comparing DRUPS with static UPS.

Who should read it

Electrical designers and investment decision makers choosing UPS and distribution-voltage architecture for large data centres.

Document contents

  1. Introduction
  2. The ever-growing demand
  3. What does it take to keep the world connected?
  4. The goal is uninterruptible power
  5. Where do you compromise and maximize the investment?
  6. How much is enough?
  7. Going old school: a typical infrastructure
  8. A new generation of power
  9. Maximize your infrastructure: harness medium voltage
  10. The new school: optimized medium voltage distribution
  11. The next step

Publication details

Authors
HITEC Power Protection
Publisher
HITEC Power Protection
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Public manufacturer document or page inspected. No document-specific redistribution permission established; retain metadata and original short summaries only.

Citation

HITEC Power Protection Optimizing the Medium Voltage Data Center: How to attain infrastructure reliability and reduce energy usage. HITEC Power Protection. https://hitec-ups.com/wp-content/uploads/2020/09/HITEC-WP-Datacenter_A4-v2.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.