A HITEC Power Protection white paper arguing for diesel rotary UPS (DRUPS) and medium-voltage distribution over battery-based static UPS, calculating that a 5-minute battery for 400 kW needs about 200 sq ft of extra space.
On this page
Overview
The paper argues that most data-centre cost comes from space and power infrastructure, and that battery-based static UPS takes up space and is often the main cause of prolonged failures. It cites a Ponemon Institute survey: 91% of respondents had an unplanned data-centre outage, with UPS battery failure and human error the top causes.
Its cost example: a battery carrying a 400 kW load for five minutes needs roughly 200 sq ft of extra space and about $200,000 in construction cost, taking a minimum start-up cost of $1,000 per sq ft. Layers of redundancy, with stranded capacity, often leave owners with under 50% utilisation.
The proposed solution is a DRUPS that takes power at medium voltage (for example 2,400-35,000 V) and distributes at the same voltage. In the old chain medium voltage is stepped to 480 V and then down again at the PDU, and each layer adds cost and inefficiency. Medium-voltage distribution means fewer and smaller conductors, lower voltage drop and less heat; 4,160 V motors can serve cooling and 415/240 V or 480/208 V can serve tenants, stepping down where needed. The document is a vendor publication that promotes DRUPS.
Key points
- In a Ponemon Institute survey 91% of respondents had an unplanned data-centre outage; the top causes were UPS battery failure and human error.
- A 5-minute, 400 kW battery needs about 200 sq ft of extra space and about $200,000 in construction (at $1,000 per sq ft start-up cost).
- Layered redundancy often leaves owners with utilisation below 50%.
- The old chain: medium voltage (2,400-35,000 V), 480 V distribution, UPS, PDU to low voltage; each layer adds cost and inefficiency.
- DRUPS is presented as able to provide continuous, conditioned power at medium voltage.
- Medium-voltage distribution allows fewer and smaller copper conductors, lower voltage drop and less heat.
- In a properly redundant medium-voltage system, if a tenant uses under half its power the rest can be redistributed, lifting utilisation well above 50%, possibly above 75%.
- A maintained DRUPS lasts over 25 years and supplies high short-circuit current to clear load fuses.
Using it in design
- In UPS selection, add battery-room space and construction cost (per sq ft or m2) explicitly to the total investment calculation.
- Compare medium-voltage and 480 V distribution on conductor size, voltage drop and heat loss.
- Record the stranded capacity created by redundancy layers (utilisation under 50%) in the capacity plan and explore load-sharing options.
- Evaluate medium-voltage cooling motors (for example 4,160 V) and tenant-specific IT voltages in the single-line design.
- The paper is a vendor view; request independent reliability data when comparing DRUPS with static UPS.
Who should read it
Electrical designers and investment decision makers choosing UPS and distribution-voltage architecture for large data centres.
Document contents
- Introduction
- The ever-growing demand
- What does it take to keep the world connected?
- The goal is uninterruptible power
- Where do you compromise and maximize the investment?
- How much is enough?
- Going old school: a typical infrastructure
- A new generation of power
- Maximize your infrastructure: harness medium voltage
- The new school: optimized medium voltage distribution
- The next step
Publication details
- Authors
- HITEC Power Protection
- Publisher
- HITEC Power Protection
- Year
- Year not stated
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Public manufacturer document or page inspected. No document-specific redistribution permission established; retain metadata and original short summaries only.
Citation
HITEC Power Protection Optimizing the Medium Voltage Data Center: How to attain infrastructure reliability and reduce energy usage. HITEC Power Protection. https://hitec-ups.com/wp-content/uploads/2020/09/HITEC-WP-Datacenter_A4-v2.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.