The document argues that energy measurement in data centres must do more than display consumption: high availability depends on a secure supply and on staying within grid compatibility limits, and loads and extreme values must be monitored continuously. Its starting point is DIN EN 50600-2-2:2019, which defines requirements for measurement technology and power quality compatibility levels. The standard defines three granularity levels for energy efficiency.
Level 1 covers measurement at primary and secondary supplies and at UPS outputs, level 2 covers intermediate points between primary distribution and the outputs of secondary distribution, and level 3 covers protected socket outlets fed from tertiary distribution. Level 1 requires class 0.5 for active energy and power on all phases (current transformers to EN 61869-2 class 0.5, devices to EN 62053 class 0.5S or EN 61557-12 class 0.5), with class 0.2 and class A devices preferred. For levels 1-2, class 1 suffices. Level 3 accepts class 2, though higher classes are recommended.
On power quality, primary and secondary supplies must comply with EN 50160, an additional supply not from the utility with EN 61000-2-4 class 2, and the path between UPS and protected sockets with EN 61000-2-4 class 1; EN 61000-2-4 applies up to 36 kV. The paper also stresses that neutral current must be measured or calculated in three-phase circuits, because many single-phase loads and third harmonics can overheat the unprotected neutral and cause neutral point shift.
The conclusion states that extreme values can only be assessed with high sampling rates and data storage capacity that conventional building management systems lack, and that the requirements of EN 50600 part 8 and EN 62974-1 can be met with an ISO 50001/50006 energy management system. The text comes from a manufacturer and names example devices and GridVis software; the standard's requirements should be read independently of product names.
Key points
- EN 50600-2-2 defines three granularity levels: level 1 (primary/secondary supplies and UPS outputs), level 2 (intermediate distribution points), level 3 (protected sockets from tertiary distribution).
- Level 1: class 0.5 for active energy and power (CT: EN 61869-2 class 0.5; device: EN 62053 class 0.5S or EN 61557-12 class 0.5), preferably class 0.2 with class A devices.
- Levels 1-2: class 1 (CT class 1, device EN 62053 or EN 61557-12 class 1); level 3 accepts class 2, with higher classes recommended.
- PUE is total data centre energy divided by IT equipment energy; water-cooled sites should also track WUE.
- Primary and secondary supplies must meet EN 50160, an additional supply EN 61000-2-4 class 2, and UPS-to-socket EN 61000-2-4 class 1.
- If energy is billed in kWh, MID meters are needed: at least class 1 for active energy and class 2 for reactive energy.
- A capacity report shows all measuring points from feed-in to final circuit in percent and absolute values; an EN 61000-2-4 report is not suited to availability evaluation, so a dedicated high-availability report is needed.
- Residual current monitoring (EN 50600-2-2 section 6.5.1) is recommended with six-current-input devices at levels 1-2 and multi-channel devices at level 3.
- Because the neutral conductor is usually unfused, neutral current should be measured or calculated for non-linear loads.
Using it in design
- Build the metering point list by the three levels: supply inputs and UPS outputs, intermediate distribution points, protected socket groups; write the required accuracy class (0.5, 1, 2) against each point.
- Specify the class of the current transformer together with the meter; accuracy equals the weakest link in the chain.
- At level 3, select distribution equipment so that different load types (IT, fire, environmental control) can be measured separately.
- For PUE and, if needed, WUE, tie IT energy to a measurement level, and size sampling and storage capacity against the high-availability report.
- Include MID-certified meters for billing, a separate residual-current monitoring concept and neutral current measurement in the design.
Who should read it
Electrical engineers designing data centre metering and monitoring architecture, and energy management leads.
Document contents
- EN 50600-2-2 and three granularity levels
- Measurement technology for level 1
- Measurement technology for level 2
- Requirements for level 3
- Further comments on granularity levels: capacity report, MID meters
- Power quality requirements (EN 50600-2-2 parts 6.2.3.1 and 6.2.5.4)
- High availability reports
- Residual current measurements (part 6.5.1)
- Conclusion
Publication details
- Authors
- Janitza electronics
- Publisher
- Janitza electronics
- Year
- 2025
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
Official public manufacturer source inspected. No document-specific redistribution permission established; metadata and original brief summaries only. Local downloads are research evidence, not a redistribution package.
Citation
Janitza electronics (2025). Energy Monitoring for Data Centers. Janitza electronics. https://assets.janitza.com/2sy6zv1cbi8q/3ArCWwGdHzNQ4u0PZe2aVN/b9a57b78f5a64a3b1cad3cbf12a2fc35/Whitepaper_Energy-Monitoring-for-data-centers__EN_.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.