Technical guideFree to read2022

Transformerless UPS Systems and the 9900

Mitsubishi Electric Power Products, Inc. · John Steele (Mitsubishi Electric Power Products, Critical Power Solutions Division)

A 2022 Mitsubishi Electric Power Products white paper: the transformerless, IGBT-converter, three-level 9900 series holds input current harmonics under 3% at full load and exceeds 96% efficiency at 100% load.

On this page

Overview

The paper explains that transformerless true on-line double conversion has become the topology of choice below 200 kW, while larger applications still use UPS with transformers or paralleled power modules. Transformerless designs above 200 kW face ground faults, high-frequency noise and efficiency problems; IGBTs switch fast, which raises switching losses, so many manufacturers still use thyristors in the rectifier section.

The background section lists the functions of the transformer in a traditional UPS: the 30 degree phase shift in a 12-pulse SCR rectifier, reducing input harmonics, isolation from the mains against battery-caused DC ground faults, and re-establishing the neutral-ground bond at the output. Rectifier types (6-pulse SCR, 12-pulse SCR, diode bridge, IGBT) are compared; all but the IGBT need an input filter, which can create a leading power factor at light load and upset generator compatibility.

For the Mitsubishi 9900 series the three-level topology was chosen to cut IGBT switching loss and to hold high efficiency down to 10% load. Input current harmonics are under 3% at 100% load with no harmonic filter, only a small EMI filter. Control uses a DSP, ASIC and FPGA with minor current and major voltage loops, sampling above 48 kHz (800 per cycle). The inverter holds voltage within 2% for a 0-100% load step and carries the step without batteries.

The design also filters common-mode harmonics through a virtual neutral and detects DC and phase-to-ground faults on grounded or ungrounded sources. This is a manufacturer white paper promoting the 9900; efficiency is given as one figure (above 96% at 100% load) with no load curve. Sizes are stated as 72 kW to 750 kW for a single module and up to 3750 kW multi-module (up to eight units).

Key points

  1. Transformerless double-conversion UPS is the topology of choice below 200 kW; above 200 kW ground faults, high-frequency noise and efficiency are difficult.
  2. An input filter is needed with all rectifier types (except IGBT) to bring input current harmonics under 10% THDi; it can create a leading power factor at light load and upset generator compatibility.
  3. In the 9900 series input current harmonics are under 3% at 100% load without a harmonic filter; only a small EMI filter is used.
  4. The three-level topology keeps efficiency high down to 10% load; efficiency exceeds 96% at 100% load.
  5. The inverter gives under 2% output voltage deviation for a 0-100% load step, carried without batteries.
  6. Control sampling is above 48 kHz (800 samples per cycle); on an output short the inverter stops switching and transfers to bypass, and on a utility-side fault it goes to battery.
  7. The multi-module system (MMS) parallels up to eight units of matching kVA; control data is shared over redundant Cat 5e cables.
  8. The virtual neutral filters common-mode harmonics and enables detection of phase-to-ground and DC ground faults.
  9. Ratings run 72-750 kW as a single module and up to 3750 kW multi-module.

Using it in design

  • When selecting a transformerless UPS, clarify on the single-line diagram where the input transformer's isolation and neutral-ground bonding functions will be provided (distribution transformer, output side).
  • For a UPS working with a generator, take input harmonic distortion and light-load power factor (leading power factor risk) from the data sheet; query generator compatibility for filtered rectifiers.
  • Ask the supplier for the ground-fault detection method (grounded and ungrounded sources, DC ground fault) and include it in the protection coordination study.
  • For a part-load efficiency target, write the efficiency curve (for example at 10% load) and the voltage deviation for a 0-100% load step into the specification.
  • In multi-module parallel systems check control redundancy (independent logic in each module, redundant communication).

Who should read it

Electrical designers selecting high-power UPS and comparing transformer-based and transformerless topologies, and engineers doing generator and harmonic compatibility studies.

Document contents

  1. Introduction
  2. Background: converter section (6- and 12-pulse SCR, diode bridge, IGBT) and inverter section
  3. The Mitsubishi 9900 series transformerless UPS systems
  4. Control system and multi-module control
  5. Virtual neutral
  6. Fault conditions and DC ground fault
  7. Summary

Related standards

  • IEC 62040-3
  • IEEE 519

Publication details

Authors
John Steele (Mitsubishi Electric Power Products, Critical Power Solutions Division)
Publisher
Mitsubishi Electric Power Products, Inc.
Year
2022
Document number
SA-ENL0079R3
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

Vendor white paper, free PDF from mitsubishicritical.com literature page; no open licence stated.

Citation

John Steele (Mitsubishi Electric Power Products, Critical Power Solutions Division) (2022). Transformerless UPS Systems and the 9900. Mitsubishi Electric Power Products, Inc.. SA-ENL0079R3. https://mitsubishicritical.com/wp-content/uploads/2025/02/sa-enl0079-transformerless-ups-systems-and-the-9900.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.