Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions
North American Electric Reliability Corporation (NERC)
NERC's short report on the 10 July 2024 Eastern Interconnection event, describing how about 1,500 MW of data-centre load left the grid during 230 kV line faults and what that means for UPS and transfer design.
On this page
Overview
The report describes how, at about 19:00 on 10 July 2024, a lightning arrestor on a 230 kV line failed and became a permanent fault that locked out the line. Because the auto-reclose control was set for three attempts at each end of the line, 6 successive faults occurred in 82 seconds. The protection system cleared all of them properly; fault durations were 42 to 66 ms and the faulted-phase voltage in the load-loss area ranged from 0.25 to 0.40 pu.
In the same period the area saw about 1,500 MW of load reduction. None of it was disconnected by utility equipment; it was disconnected by customer-side protection and controls, and all of it was data-centre-type load. Frequency rose to a high of 60.047 Hz and returned to 60.0 Hz in about 4 minutes, voltage rose to a maximum of 1.07 pu, and operators removed local shunt capacitor banks to bring voltage back to normal.
Discussions with data-centre owners showed that the sites transferred their loads to backup power systems. Centralised static UPSs at load-centre level are typically 2-5 MW; decentralised rack-level UPSs are typically 3-4 kW; DRUPSs use a flywheel and quickly start a diesel engine. Static UPSs return the load to the grid soon after the fault clears, whereas for a DRUPS the transfer back to the grid is typically manual. Some sites also use a counting scheme that, when three voltage disturbances are seen within one minute, moves the load to backup and keeps it there until manually reconnected. Most of the sustained load loss (about 1,260 MW) coincided with the third voltage depression, the third auto-reclose attempt, and did not return for hours.
The report recommends that planners and operators require dynamic response models of large loads in interconnection requirements, study the potential size of load loss during faults, consider voltage-sensitive load loss when configuring auto-reclosing, monitor for load losses coincident with faults, and include ramp rates in operating agreements for reconnecting large loads. Open questions such as the definition of a large load are also listed.
Key points
- A lightning arrestor failure and three auto-reclose attempts at each line end produced six successive faults in 82 seconds.
- Fault durations 42-66 ms; faulted-phase voltage in the load-loss area 0.25-0.40 pu.
- About 1,500 MW of load, entirely data-centre type, left the grid through customer-side protection and controls.
- Frequency peaked at 60.047 Hz (back to normal in about 4 minutes), voltage at 1.07 pu.
- Centralised static UPS typically 2-5 MW; decentralised rack UPS typically 3-4 kW; DRUPS use a flywheel.
- Static UPSs return the load to the grid soon after; DRUPS transfer back to the grid is typically manual.
- Some sites count voltage disturbances (typically three within one minute), keep the load on backup and reconnect manually.
- About 1,260 MW dropped at the third voltage depression (third auto-reclose) and did not return for hours.
- Recommendation: consider voltage-sensitive load loss when configuring auto-reclosing and monitor for load losses coincident with faults.
Using it in design
- Document the UPS and transfer disturbance-counting scheme (for example three disturbances in one minute) explicitly in the grid-connection study, and define whether reconnection is manual or automatic.
- For DRUPS designs, put into the operating procedure that transfer back to the grid is manual and that the grid sees this as load that does not return.
- Share with the grid operator the auto-reclose settings and voltage-depression durations (the 42-66 ms order) and verify the UPS ride-through behaviour against such disturbances.
- Define a stepped ramp rate for reconnection and write it into the operating agreement; do not take the whole load back at once.
- So that a dynamic response model can be supplied in the interconnection application, ask the manufacturer for the voltage-dip response of the UPS and cooling loads.
Who should read it
Electrical engineers working on grid connection, UPS and transfer design, and grid planners.
Document contents
- Primary takeaways
- Summary of incident
- Incident details
- Load details
- Future considerations
Related standards
- IEC 62040-3
- IEEE 1668
Publication details
- Authors
- North American Electric Reliability Corporation (NERC)
- Publisher
- North American Electric Reliability Corporation (NERC)
- Year
- 2025
- Document language
- English
- Source type
- Expert / community
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
NERC publication; no open licence stated.
Citation
North American Electric Reliability Corporation (NERC) (2025). Incident Review: Considering Simultaneous Voltage-Sensitive Load Reductions. North American Electric Reliability Corporation (NERC). https://nerc.com/pa/rrm/ea/Documents/Incident_Review_Large_Load_Loss.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.