Technical guideFree to read2019

Powerduct Series Busway: Installation Manual

Power Plug Busduct; distributor-hosted copy by IPD · Power Plug Busduct

This 32-page manual from Power Plug Busduct (Malaysia), dated April 2019, gives step-by-step instructions for handling, jointing, supporting, fitting tap-off units to and maintaining Powerduct busway. Joint bolts are tightened to at least 68 Nm (50 lb-ft), horizontal hangers are spaced at no more than 2.5 m and vertical supports at no more than 4.8 m.

On this page

Overview

The manual covers Powerduct busway from arrival on site to energisation and addresses electrical engineers, contractors, electricians and maintenance staff. The general section opens with handling and storage rules: sections are never lifted by the bar ends, crane lifts use nylon straps with a balanced load, busway is not dragged across the floor, and it is stored indoors in a clean, dry place at a uniform temperature to prevent condensation. Contact with corrosive fumes, liquids, salts or concrete is listed among the storage faults that void the warranty.

For pieces whose length is not fixed at design stage, the manual describes the hold element method: the customer measures on site and the final fit piece ships within 5 to 10 working days. For straight feeders, elbows and offsets, the order length is the measured value minus 210 mm, and the neutral position (A or B) is stated separately. Before installation each piece is inspected for damage and contamination, the joint insulators are checked, and an insulation resistance (megger) test is made. Phase sequence is followed through the arrow on the end block and compared with the installation drawing.

Jointing is described separately by degree of protection: joint cover and gasket for IP54 and IP55, additional seals and sealant for IP56, IP65 and IP66, and a two-part IP gel fill for horizontal and vertical positions. The gel components are mixed 1:1 and cure fully in 8 to 12 hours at 25 °C or 1 hour at 80 °C. The joint bolt is tightened until the outer head of the double-headed bolt shears off; the minimum torque is given as 50 lb-ft (68 Nm).

The mounting section recommends 1/2 inch (12 mm) drop rods at a maximum spacing of 2.5 m for horizontal runs and requires that joints are not used as support points. Vertical runs are supported at no more than 4.8 m centres; spring hanger settings are calculated from the busway weight per floor plus the weight of devices on that floor. Shipping screws on expansion fittings have to be removed before energising. A tap-off (plug-in) unit is fitted or removed only with its switch in the OFF position.

The maintenance section covers control of dust, moisture and foreign matter, hot-spot scanning with an infrared thermometer, and torque follow-up: torque is checked after six months and then at least once a year. After any repair the run is isolated and megger tested, with the minimum acceptable reading depending on run length. The manual ends with a 22-item installation checklist and a form for recording pre-energising insulation readings. The checklist does not replace the contractor's obligations under the specification and applicable codes.

Key points

  1. Joint bolt torque: at least 50 lb-ft (68 Nm) at installation; the maintenance section gives the shear-off value of the double-headed bolt as about 55 ± 5 lb-ft.
  2. Torque is checked after six months and at least annually afterwards; joint cap bolts are tightened to 25 lb-ft (34 Nm).
  3. Horizontal mounting: 1/2 inch (12 mm) drop rods at 2.5 m maximum spacing; a 40 mm × 3 mm support channel is suggested for 2000 A and below and 50 mm × 6 mm for 2500 A and above.
  4. Vertical mounting: supports at 4.8 m maximum centres; for the riser to act as a free end, the last horizontal hanger sits 2.4 m from the bottom elbow.
  5. Minimum insulation resistance after repair: MΩ = 66 / run length in metres, or 200 / run length in feet; individual pieces tested before installation should read infinite resistance.
  6. IP gel: compounds A and B are mixed 1:1; full cure takes 8 to 12 hours at 25 °C or 1 hour at 80 °C.
  7. Hold element measurement: order length equals measured length minus 210 mm (example: 1313 mm for a 1523 mm measurement); the final fit piece ships within 5 to 10 working days.
  8. Busway weight must not bear on the terminations of switchgear, switchboards or transformers, and the gap between busway and floors or walls is never sealed with cement.
  9. The two shipping screws on each side of an expansion fitting are removed before energising; hangers beyond its free end, except the farthest one, must be non-rigid.

Using it in design

  • Use the 2.5 m limit for horizontal runs and the 4.8 m limit for vertical runs in the hanger and support design, and place support points away from joints.
  • Provide expansion fittings on long runs and on routes that span two buildings, and specify spring or drop-rod (non-rigid) hangers beyond the fitting's free end.
  • Write the commissioning specification with separate steps for the megger test of each piece, the interim test after every two or three pieces and the recorded final test.
  • Add the six-month torque check, the annual torque re-check and infrared hot-spot scanning to the maintenance plan.
  • Select the degree of protection for the environment, and allow for the IP56-and-above joint details and the gel cure time in the works programme.
  • Mark pieces whose length will be fixed on site as hold elements and reflect the 5 to 10 working day delivery in the installation schedule.

Who should read it

Electrical engineers designing busway routes, installation contractors, commissioning teams and facility maintenance managers.

Document contents

  1. General Information: Introduction, Handling (Including Unpacking), Storage Precautions
  2. Hold element measuring
  3. Pre-Installation Procedure and Busway Installation
  4. Busway Installation for IP54 & IP55: Joining Busway Procedures
  5. Busway Installation for IP56, IP65 & IP66: Installation Procedures
  6. IP Gel Installation Procedure: Horizontal Position (I), Horizontal Position (II), Vertical Position
  7. Busway Mounting: Horizontal Mounting, Vertical Mounting, Expansion Fittings
  8. Tap-Off Box Mounting: Installing Tap-Off Unit, Removing Tap-Off Unit, Horizontal Mounting
  9. Busway Maintenance Procedures: Inspecting Current-Carrying Components, Energizing
  10. Busway Installation Checklist

Publication details

Authors
Power Plug Busduct
Publisher
Power Plug Busduct; distributor-hosted copy by IPD
Year
2019
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Power Plug Busduct (2019). Powerduct Series Busway: Installation Manual. Power Plug Busduct; distributor-hosted copy by IPD. https://resources.ipd.com.au/powerduct/Content/documents/Powerduct-Installation-Manual.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.