Technical guideFree to readYear not stated

Mitsubishi Electric BC43 Battery Cabinet Drawing (91443-M-SD01-1)

Original title BC43 battery cabinet outline and battery table

Mitsubishi Electric

Mitsubishi Electric Power Products BC43 battery cabinet drawing (April 2025): 40 battery blocks, 200-600 A breakers for 80-1050 kVA UPS, empty cabinet about 488 lb, 2310-4858 lb with batteries, UL 1778 listed.

On this page

Overview

The document is a two-page core reference drawing of the Mitsubishi Electric Power Products BC43 battery cabinet (91443-M-SD01-1, dated 14 April 2025). Sheet one holds the part-number breakdown, battery table, top, front, side and bottom views and notes. The cabinet holds 40 blocks of 12 V; selectable batteries include the EnerSys HX series (HX205 to HX540) and the C&D UPS12 series (305-605 W).

The notes give an empty cabinet weight of about 488 lb and a system weight between 2310 and 4858 lb (for example 2310 lb with 205W batteries and 4978 lb with 605W). Factory assembled cabinets are UL 1778 and CSA C22.2 No. 107.3 listed, with a NEMA 1 enclosure and heavy-gauge welded steel. Batteries are accessible from front and rear; at least 36 inches of front clearance and 2 inches at top and rear are required for cooling. Optional seismic codes are Z (IBC and CBC, Seismic Design Category F, SS=2.0, importance factor 1.5) and H (OSHPD).

Sheet two gives typical battery wiring and the breaker table. By UPS rating the breaker is 200 A for 80 kVA, 225 A for 100 kVA, 350 A for 150 kVA, 400 A for 160 kVA, 500 A for 225 kVA, 400 A for 300 kVA, 500 A for 375 kVA and 600 A for 500-1050 kVA; tie and intercell cables go from #1 AWG to 2x 2/0 AWG. The cabinet ships with a battery jumper removed, cables to the UPS are provided by others and breakers ship in the off position.

Key points

  1. BC43 cabinet: 40 blocks of 12 V; EnerSys HX205-HX540 and C&D UPS12-305 to UPS12-605 battery options.
  2. Empty cabinet about 488 lb; 2310-4858 lb with batteries.
  3. UL 1778 and CSA C22.2 No. 107.3 listed; NEMA 1; drawing dated 14 April 2025.
  4. Breaker current: 80 kVA 200 A, 100 kVA 225 A, 150 kVA 350 A, 160 kVA 400 A, 225 kVA 500 A, 300 kVA 400 A, 375 kVA 500 A, 500-1050 kVA 600 A.
  5. At least 36 inches front clearance and 2 inches top and rear.
  6. Seismic options: Z (IBC/CBC, category F, SS=2.0) and H (OSHPD).
  7. Batteries accessible from front and rear; pallet-jack access point for transport.
  8. Cables to the UPS are outside the cabinet scope.

Using it in design

  • Calculate floor loading from the cabinet's loaded weight: 2310 to 4978 lb per cabinet.
  • Leave 36 inches of front service clearance and 2 inches of top and rear ventilation clearance in the battery room.
  • Select breaker current from the table by UPS kVA and verify cable size (#1 AWG to 2x 2/0 AWG).
  • In seismic zones, specify the Z or H coded cabinet.
  • The cabinet ships with the battery jumper removed; add the connection step to the commissioning plan.

Who should read it

Electrical designers selecting battery cabinets for Mitsubishi Electric UPS systems and commissioning engineers.

Document contents

  1. Part number breakdown and battery table
  2. Top, front, side and isometric views
  3. Notes (weights, listings, clearances, seismic codes)
  4. Typical battery wiring
  5. Breaker and cable information by UPS size
  6. Cabinet weights by battery size

Publication details

Authors
Mitsubishi Electric
Publisher
Mitsubishi Electric
Year
Year not stated
Document number
91443-M-SD01-1 rev.5
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Mitsubishi Electric BC43 battery cabinet outline and battery table. Mitsubishi Electric. 91443-M-SD01-1 rev.5. https://mitsubishicritical.com/wp-content/uploads/2025/02/BC43-91443-M-SD01-1.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.