Technical guideFree to readYear not stated

BPE MPP Series 10-20 kVA Three-Phase Rack Mount Online UPS

Original title BPE MPP Series 10–20 kVA 3:3 catalogue, p.2 technical specifications

Best Power Equipments (BPE)

BPE MPP series 10, 15 and 20 kVA (kW = kVA) 3U rack three-phase in/out online UPS: VFI-SS-111, 96% double-conversion and 99% or higher ECO efficiency, up to 4 units in parallel.

On this page

Overview

The catalogue presents the BPE MPP models MPP3310L30, MPP3315L30 and MPP3320L30: three-phase input and output, 10/15/20 kVA with kW equal to kVA, meaning output power factor 1. The unit is true online double conversion (VFI-SS-111), DSP controlled, with pure sine output; it can be installed as rack or tower. Features include 3-stage charging, frequency conversion mode, ECO mode, EPO, parallel expansion up to 4 units, 30-50 battery configurations, fan speed regulation by load, automatic static bypass, cold and soft start and generator compatibility.

Technical data: input 380/400/415 Vac (3P+N+PE), 228-480 Vac, 40-70 Hz, PF ≥0.99. Output regulation ±1%, crest factor 3:1, harmonic distortion ≤1%, transfer time zero. Overload is <110% for 60 min, 110-125% for 10 min, 125-150% for 1 min and >150% for 200 ms. Efficiency is 96% in double conversion and 99% or higher in ECO mode. The battery is VRLA or lithium compatible, ±180 to ±300 Vdc, 30-50 pieces, maximum charge current 20 A.

Physical data: 443 x 580 x 133 mm (3U), net weight 29 kg for 10-15 kVA and 33 kg for 20 kVA. Operation is 0-50 °C, humidity 0-95% non-condensing, altitude 1500 m, noise below 55-58 dBA at 1 m. Standards are IEC/EN 62040-1, -2, -3 and CE. Communication is RS232, RS485, EPO and a parallel port; SNMP, dry contact and IoT are optional. The catalogue also lists battery pack models.

Key points

  1. MPP3310L30, MPP3315L30, MPP3320L30: 10, 15, 20 kVA (kW = kVA); 3U; up to 4 units in parallel.
  2. VFI-SS-111; pure sine; zero transfer time.
  3. Input 380/400/415 Vac, 228-480 Vac, 40-70 Hz, PF ≥0.99.
  4. Output regulation ±1%, THD ≤1%, crest factor 3:1.
  5. Efficiency: 96% double conversion, ≥99% ECO.
  6. Overload: 60 min <110%, 10 min 110-125%, 1 min 125-150%, 200 ms >150%.
  7. Battery ±180 to ±300 Vdc, 30-50 pieces, VRLA or lithium; charge current up to 20 A.
  8. 443 x 580 x 133 mm; 29-33 kg; 0-50 °C; altitude 1500 m.

Using it in design

  • In rack-based small data rooms, carry the 3U height and 29-33 kg weight into the rack load calculation.
  • Limit paralleling to 4 units and plan redundancy (N+1) accordingly.
  • When using ECO efficiency in energy models, account for the changed protection class in that mode.
  • With lithium batteries, keep to the 30-50 piece range and the 20 A charge limit.
  • Record input PF ≥0.99 and the wide input window in generator compatibility notes.

Who should read it

Electrical designers selecting rack-mount three-phase UPS units for small data rooms and edge sites.

Document contents

  1. Features and rear panel
  2. Technical specifications MPP 10-20 kVA
  3. Technical specifications of battery packs

Publication details

Authors
Best Power Equipments (BPE)
Publisher
Best Power Equipments (BPE)
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Best Power Equipments (BPE) BPE MPP Series 10–20 kVA 3:3 catalogue, p.2 technical specifications. Best Power Equipments (BPE). https://cdn.prod.website-files.com/69c60f84565f2d4b25a3c71f/69f8335f84bb32fd0fe4c29c_18032026045855MPP_Series_10~20kVA_33_catalogue.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.