Staco Energy Products

Staco FirstLine PL is a 10-40 kVA three-phase double-conversion online UPS: up to 94% efficiency, input PF 0.99, THDi <1%, up to 4 units in parallel and a galvanically isolated output transformer.

On this page

Overview

The brochure presents Staco Energy's FirstLine PL series. It is a three-phase double-conversion online UPS in five ratings: 10/9, 15/13.5, 20/18, 30/27 and 40/36 kVA/kW. Its IGBT-based rectifier/inverter makes it a 'zero impact source': input current distortion THDi is below 1% at full load, input power factor is 0.99, and the rectifier walks in from 25% to 100% load over 5 seconds. This eases installation where supply or generator capacity is limited.

Input is 208Y/120 V or 220Y/127 V three-phase four-wire, set from the front panel, with a range of +15%/-20% and battery discharge at -15% input with full load. Frequency is 50/60 Hz +/-5 Hz. Output static regulation is +/-2%, transient deviation for a 100% step is below 5% RMS, recovering to 95% within 10 ms. Voltage THD is below 1% on linear load. Inverter overload is 125% for 10 min and 150% for 60 s, and bypass overload is 400% for 10 s and 1000% for half a line cycle.

The units handle capacitive loads such as blade servers without loss of active power: from 0.9 lead to 0.8 lag and up to 0.8 capacitive, with a low derating of 15%. For redundancy, up to 4 units run in parallel (N+1), and Dual Bus and Dynamic Dual Bus configurations are supported. Further features are an output transformer with galvanic isolation, dual input (main and emergency standby source), the Battery Care System, and a 50/60 Hz frequency-converter setting on all units.

The table gives internal battery runtimes (-1 model) of 37 min for 10 kVA, 21 min for 15 kVA, 14 min for 20 kVA, 8 min for 30 kVA and 4 min for 40 kVA. Heat rejection is 3,412 BTU/hr for 10 kVA and 13,649 BTU/hr for 40 kVA. Load derates 1% per 100 m above 1000 m, maximum operating temperature is 40 °C, and noise is 61 to 67 dBA. Dimensions run from 1059x516x838 mm to 1321x589x838 mm and weights from 186 kg to 431 kg (-0 models 186-266 kg, -1 model 431 kg). The warranty is two years.

Key points

  1. Five ratings: 10/9, 15/13.5, 20/18, 30/27 and 40/36 kVA/kW; efficiency up to 94%.
  2. Input PF 0.99 (full load), THDi <1% (full load), <2% (50%), <5% (10%); 5 s walk-in.
  3. Input 208Y/120 V or 220Y/127 V, +15%/-20% range; frequency 50/60 Hz +/-5 Hz.
  4. Output: static +/-2%, transient <5% RMS, recovery to 95% in 10 ms; THD <1% (linear).
  5. Inverter overload: 10 min 125%, 60 s 150%; bypass: 10 s 400%, half cycle 1000%.
  6. Up to 4 units in parallel (N+1), Dual Bus and Dynamic Dual Bus; dual input.
  7. Capacitive loads down to 0.8 capacitive PF with 15% derating; compatible with blade servers.
  8. Internal battery runtime (-1 model): 37, 21, 14, 8 and 4 min (10, 15, 20, 30, 40 kVA).
  9. Heat rejection 3,412 (10 kVA) to 13,649 (40 kVA) BTU/hr; 1% per 100 m derating above 1000 m.

Using it in design

  • For generator-fed sites, use THDi <1% and PF 0.99 in generator sizing, and match the walk-in time to the generator's load acceptance steps.
  • For capacitive loads such as blade servers, compare the PF range (0.9 lead to 0.8 lag, 15% derating down to 0.8 capacitive) with the UPS kW limit.
  • Add the heat load (BTU/hr) to the cooling calculation: 13,649 BTU/hr for the 40 kVA.
  • For N+1, carry the 4-unit limit and the CANBUS parallel card into the design.
  • Where galvanic isolation is required, choose the transformer model and include the weight and size difference (186-431 kg) in the floor loading.

Who should read it

Electrical designers and buyers selecting 10-40 kVA UPS for small and medium data rooms and critical facilities.

Document contents

  1. Key features and operational benefits
  2. Main characteristics
  3. AC input performance
  4. Flexibility, parallel and Dual Bus
  5. Battery Care System and mimic panel
  6. Technical specifications

Publication details

Authors
Staco Energy Products
Publisher
Staco Energy Products
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Staco Energy Products Staco FirstLine PL brochure FL-PL_bro-160913, 2016, technical specifications and model list. Staco Energy Products. https://www.lorbel.com/wp-content/uploads/2020/09/STACO-Firstline-PL.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.