Telergon ATS C1 and C2 catalogue
Telergon
Telergon's C1 (remote C1-G, automatic C1-C) and C2 automatic transfer switches from 63 to 630 A, with IEC 60947-6-1 data, a 120 kA conditional short-circuit rating and enclosed versions.
On this page
Overview
The catalogue presents Telergon's automatic transfer switch (ATS) range. An ATS moves a load from the primary source to a backup source on its own when the primary fails. Two series are covered, C1 and C2, both from 63 A to 630 A. C1-G is remotely operated and not self-acting; C1-C and C2 transfer automatically.
According to the function table, C1-G offers AC-32B, an external 230 Vac supply and remote control by potential-free contacts. C1-C and C2 add single-phase or three-phase monitoring, automatic transfer and recovery, passive fire linkage, generator start/stop, source priority and a 24 Vdc auxiliary input. C2 also includes RS-485, an engine exerciser and an LCD as standard; the display is an option on C1-C. C2 is AC-33B.
The technical tables follow IEC 60947-6-1. Rated insulation voltage is 690 V, impulse withstand 8 kV and conditional short-circuit current 120 kA. C1 short-circuit making capacity (peak) ranges from 8 to 26 kA, and C2 from 15 to 50 kA. The C2 0.2 s short-time withstand ranges from 10 kA (30 ms footnote for 63/80 A) to 25 kA. Operating transfer time is 1.7-3.1 s for C1 and 1.2-3.3 s for C2.
Enclosed solutions are the CTRL1 and CTRL2 series. CTRL1 is rated IP66 and CTRL2 IP65; both use 2 mm steel, epoxy coating, RAL 7035 and wall mounting. CTRL2 comes pre-wired to DIN-rail terminals.
Key points
- C1 and C2 series span 63 A to 630 A; rated insulation voltage 690 V, impulse withstand 8 kV.
- Conditional short-circuit current (Icc) is 120 kA for both series.
- C1-G is remote (AC-32B); C1-C is automatic (AC-32B); C2 is automatic and programmable (AC-33B).
- C2 making capacity (Icm) is 15-50 kA and 0.2 s withstand (Icw) 10-25 kA; for 63/80 A the Icw is footnoted as 30 ms.
- Operating transfer time is 1.7-3.1 s for C1 and 1.2-3.3 s for C2; contact transfer time 0.6-1.5 s on C2.
- Endurance is 6,000 cycles for 63-250 A, 4,000 for 400 A and 3,000 for 630 A.
- CTRL1 enclosure is IP66 and CTRL2 is IP65, both 63-630 A.
- C2 functions: three-phase monitoring, generator start/stop, source priority, RS-485 and engine exerciser.
Using it in design
- When choosing the ATS class, check the function difference between C1-G (remote), C1-C and C2 (automatic) in the table; choose C2 if generator start/stop or RS-485 is needed.
- In short-circuit coordination use Icc 120 kA and the C2 Icw values, keeping the 30 ms footnote for 63/80 A separate; the upstream device must clear within that withstand.
- With transfer times of 1.2-3.3 s these switches are not uninterrupted; plan UPS or equivalent bridging for the load separately.
- In dusty or mechanically exposed areas specify the CTRL1 (IP66) or CTRL2 (IP65) enclosed version, and check the connection capacity (Cu 25-2x240 mm2) against the cable size.
Who should read it
Electrical designers and panel builders specifying transfer between mains and generator.
Document contents
- Automatic Transfer Switch
- Choose your configuration and functions
- Enclosed Transfer Switches (CTRL1, CTRL2)
- Technical data (C1 and C2)
- Ordering codes and dimensions
Publication details
- Authors
- Telergon
- Publisher
- Telergon
- Year
- Year not stated
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
No document-specific redistribution permission was established. Bibliographic reference only.
Citation
Telergon Telergon ATS C1 and C2 catalogue. Telergon. https://germany.gorlan.com/wp-content/uploads/2025/04/Telergon-Catalogo-ATS-ENG.pdf
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.