Technical guideFree to readYear not stated

Telergon ATS C1 and C2 catalogue

Telergon

Telergon's C1 (remote C1-G, automatic C1-C) and C2 automatic transfer switches from 63 to 630 A, with IEC 60947-6-1 data, a 120 kA conditional short-circuit rating and enclosed versions.

On this page

Overview

The catalogue presents Telergon's automatic transfer switch (ATS) range. An ATS moves a load from the primary source to a backup source on its own when the primary fails. Two series are covered, C1 and C2, both from 63 A to 630 A. C1-G is remotely operated and not self-acting; C1-C and C2 transfer automatically.

According to the function table, C1-G offers AC-32B, an external 230 Vac supply and remote control by potential-free contacts. C1-C and C2 add single-phase or three-phase monitoring, automatic transfer and recovery, passive fire linkage, generator start/stop, source priority and a 24 Vdc auxiliary input. C2 also includes RS-485, an engine exerciser and an LCD as standard; the display is an option on C1-C. C2 is AC-33B.

The technical tables follow IEC 60947-6-1. Rated insulation voltage is 690 V, impulse withstand 8 kV and conditional short-circuit current 120 kA. C1 short-circuit making capacity (peak) ranges from 8 to 26 kA, and C2 from 15 to 50 kA. The C2 0.2 s short-time withstand ranges from 10 kA (30 ms footnote for 63/80 A) to 25 kA. Operating transfer time is 1.7-3.1 s for C1 and 1.2-3.3 s for C2.

Enclosed solutions are the CTRL1 and CTRL2 series. CTRL1 is rated IP66 and CTRL2 IP65; both use 2 mm steel, epoxy coating, RAL 7035 and wall mounting. CTRL2 comes pre-wired to DIN-rail terminals.

Key points

  1. C1 and C2 series span 63 A to 630 A; rated insulation voltage 690 V, impulse withstand 8 kV.
  2. Conditional short-circuit current (Icc) is 120 kA for both series.
  3. C1-G is remote (AC-32B); C1-C is automatic (AC-32B); C2 is automatic and programmable (AC-33B).
  4. C2 making capacity (Icm) is 15-50 kA and 0.2 s withstand (Icw) 10-25 kA; for 63/80 A the Icw is footnoted as 30 ms.
  5. Operating transfer time is 1.7-3.1 s for C1 and 1.2-3.3 s for C2; contact transfer time 0.6-1.5 s on C2.
  6. Endurance is 6,000 cycles for 63-250 A, 4,000 for 400 A and 3,000 for 630 A.
  7. CTRL1 enclosure is IP66 and CTRL2 is IP65, both 63-630 A.
  8. C2 functions: three-phase monitoring, generator start/stop, source priority, RS-485 and engine exerciser.

Using it in design

  • When choosing the ATS class, check the function difference between C1-G (remote), C1-C and C2 (automatic) in the table; choose C2 if generator start/stop or RS-485 is needed.
  • In short-circuit coordination use Icc 120 kA and the C2 Icw values, keeping the 30 ms footnote for 63/80 A separate; the upstream device must clear within that withstand.
  • With transfer times of 1.2-3.3 s these switches are not uninterrupted; plan UPS or equivalent bridging for the load separately.
  • In dusty or mechanically exposed areas specify the CTRL1 (IP66) or CTRL2 (IP65) enclosed version, and check the connection capacity (Cu 25-2x240 mm2) against the cable size.

Who should read it

Electrical designers and panel builders specifying transfer between mains and generator.

Document contents

  1. Automatic Transfer Switch
  2. Choose your configuration and functions
  3. Enclosed Transfer Switches (CTRL1, CTRL2)
  4. Technical data (C1 and C2)
  5. Ordering codes and dimensions

Publication details

Authors
Telergon
Publisher
Telergon
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Telergon Telergon ATS C1 and C2 catalogue. Telergon. https://germany.gorlan.com/wp-content/uploads/2025/04/Telergon-Catalogo-ATS-ENG.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.