SolarEdge Critical Power Segment Discontinuation (Form 10-Q, 31 March 2024)
Original title SolarEdge Critical Power segment discontinuation
SolarEdge
SolarEdge Technologies' US SEC Form 10-Q for the quarter ended 31 March 2024, which documents in the company's own financial statement that the Critical Power segment was discontinued in June 2022.
On this page
Overview
The document is a standard quarterly financial report filed with the US Securities and Exchange Commission. For data centre design, the relevant information is a single statement: in its segment analysis the company writes that, following the discontinuation of the Critical Power segment in June 2022, it operated four segments (Solar, Energy Storage, e-Mobility and Automation Machines). In October 2023 it decided to discontinue its light commercial vehicle e-mobility activity, and the remaining e-mobility activity was moved into the Solar segment from 1 January 2024.
The report also describes the company's current structure: two reportable segments, Solar (power optimizers, inverters, batteries and a cloud-based monitoring platform) and Energy Storage (lithium-ion cells and BESS solutions for C&I and utility markets). Other activities are combined under 'All other'. The Sella 1 manufacturing facility in northern Israel began shipping in the third quarter of 2020, and Sella 2, a Li-Ion cell facility in Korea with 2 GWh capacity, opened in May 2022.
The financial section gives revenue of 204.4 million US dollars for the three months ended 31 March 2024 (943.9 million a year earlier), a gross loss of 12.8% (against a 31.8% gross margin a year earlier) and a net loss of 157.3 million dollars. The company describes slower demand in the Solar segment since the second part of the third quarter of 2023, cancellations and push-outs from European distributors, reduced capacity in China and discontinued manufacturing in Mexico. As of 31 March 2024 it had shipped about 126.2 million power optimizers, 5.6 million inverters and 259.6 thousand residential batteries.
The document is not a product or service document; it names no UPS model and gives no end-of-service date for any model. Its value for cataloguing is that it provides the company's own financial statement of the segment closure (June 2022) as the source for the production status of the related UPS product line.
Key points
- The Critical Power segment was discontinued in June 2022; afterwards the company operated four segments (Solar, Energy Storage, e-Mobility, Automation Machines).
- In October 2023 it decided to discontinue the light commercial vehicle e-mobility activity; the remaining e-mobility is in the Solar segment from 1 January 2024.
- There are two reportable segments, Solar and Energy Storage; the others are combined under 'All other'.
- For the quarter ended 31 March 2024: revenue 204.4 million US dollars (943.9 million a year earlier), gross loss 12.8%, net loss 157.3 million dollars.
- Shipped as of 31 March 2024: about 126.2 million power optimizers, 5.6 million inverters, 259.6 thousand residential batteries.
- The Sella 2 (Korea) Li-Ion cell facility has a stated capacity of 2 GWh; production began in Texas, ended in Mexico and was reduced in China.
- The document is an SEC Form 10-Q and contains no model-level end-of-service date.
Using it in design
- For UPS product lines that came from the Critical Power segment, record the production status as 'segment closed in June 2022' and do not derive a model-level end-of-service date.
- In procurement, use such a segment closure as grounds to ask the manufacturer for written confirmation of spare parts and service continuity.
- For older UPS models added to the catalogue, keep the production-status source (such as these financial reports) in a field separate from product datasheets.
- Weigh product life-cycle risk in the supplier selection matrix alongside end-of-life and service-guarantee criteria.
Who should read it
Procurement and electrical engineers assessing UPS suppliers and product life-cycle risk.
Document contents
- Overview
- Demand and global circumstances
- Segment analysis
- Financial results
Publication details
- Authors
- SolarEdge
- Publisher
- SolarEdge
- Year
- 2024
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note
No document-specific redistribution permission was established. Bibliographic reference only.
Citation
SolarEdge (2024). SolarEdge Critical Power segment discontinuation. SolarEdge. https://investors.solaredge.com/static-files/3dfa98e5-e439-4add-8954-eee9a5a33f0e
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.
