Technical guideFree to readYear not stated

NeoPower NP3380/L 80 kVA Transformer Based 3P Online UPS Specification

Original title NeoPower NP3380/L 80kVA transformer-based three-phase online UPS specification

NeoPower

NeoPower NP3380/L is an 80 kVA three-phase double-conversion UPS with an output isolation transformer: 0.8 output power factor, 90-93% efficiency, 98% in economic mode and up to 8 units in parallel.

On this page

Overview

The page presents the 80 kVA NP3380/L from NeoPower's NP3300 series. The series covers 10 kVA to 400 kVA per unit and uses double-conversion IGBT with a DSP processor to deliver a pure sine output. An output isolation transformer is standard; an input isolation transformer and a 5th-harmonic filter are optional. Data centres, mainframes, telecom and medical equipment are named as target applications.

Electrical data: input 380 V AC (400/415 V available) 3Ph+N+PE, voltage range ±25%, 45-65 Hz, maximum 130 A, input power factor 0.8 (0.9 optional), soft start from 0 to 100% in 10 seconds. Rated output current is 115 A, THD is below 2% on linear and below 5% on non-linear load, steady-state voltage accuracy ±1%, transient response ±5% in 10 ms. Battery voltage is 192 (384) V DC, sealed maintenance-free lead acid.

Overload capacity is 60/10/1 minutes on the inverter (110/125/150% of rated current) and 18 min/10 min/1 s on bypass (150/175/200%). Size is 800x745x1400 mm, weight without battery 550 kg, protection IP22, noise below 65 dB, operating temperature -10 to 50 °C. Rated power applies below 1000 m, derated 1% per additional 100 m up to 4000 m. MTBF is stated as 30,000 hours.

Key points

  1. 80 kVA, output power factor 0.8 (0.9/1.0 optional); input 380 V (400/415 V) 3Ph+N+PE, maximum 130 A, rated output current 115 A.
  2. Efficiency: 90-93% in normal mode, 98% in economic mode; inverter efficiency 94% at full load.
  3. Output THD: below 2% on linear and below 5% on non-linear load; voltage accuracy ±1%; crest factor 3:1.
  4. Parallel operation: up to 8 units, with unbalanced-capacity paralleling and shared battery set support.
  5. Overload: inverter 60/10/1 min at 110/125/150%; bypass 18 min/10 min/1 s at 150/175/200%.
  6. Output isolation transformer standard; input isolation transformer and 5th-harmonic filter optional.
  7. Size 800x745x1400 mm, 550 kg without battery, IP22, noise below 65 dB; operation -10 to 50 °C, humidity up to 95%.
  8. Altitude derating: 1% per 100 m above 1000 m, to a maximum of 4000 m; safety standards EN 50091-1 and EN 50091-2.

Using it in design

  • With the 0.8 power factor, an 80 kVA unit carries about 64 kW of real load (72 kW with the 0.9 option).
  • Check the 550 kg unit weight without batteries as a separate item in the floor loading and layout plan.
  • Re-verify downstream short-circuit current and neutral earthing for the output isolation transformer arrangement.
  • Where harmonics matter, specify the 5th-harmonic filter and input transformer options.
  • Apply the altitude derating to the capacity calculation for sites above 1000 m.

Who should read it

Electrical designers and procurement engineers evaluating transformer-based online UPS.

Document contents

  1. General
  2. Features (reliability, information processing, paralleling)
  3. Technical Specification

Publication details

Authors
NeoPower
Publisher
NeoPower
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

NeoPower NeoPower NP3380/L 80kVA transformer-based three-phase online UPS specification. NeoPower. https://www.ineopower.com/productdetails/2.html

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace