Technical guideFree to readYear not stated

Fideltronik ARES production and factory service notice

Fideltronik Inigo

Fideltronik Inigo's notice states that Fideltronik Poland has ended production of the ARES series UPS and that factory service support ended on 1 September 2022.

On this page

Overview

The Polish-language announcement page of Fideltronik Inigo Sp. z o.o. reports the lifecycle status of the ARES series UPS. According to the text, Fideltronik Poland in Sucha Beskidzka has ended production of the ARES series of emergency power supplies, so the series should not be treated as a currently produced product.

Warranty repairs were carried out until 31 August 2022 exclusively by the factory service in Sucha Beskidzka. From 1 September 2022 Fideltronik Poland ended its UPS service support, and UPS repairs are no longer possible at the factory service.

Fideltronik Inigo, noting its many years of distributing the ARES series, declares that it will continue to support ARES users with post-warranty repairs within its current technical capabilities. The page contains no technical data, model list or replacement recommendation; it covers only production and service status.

Key points

  1. Fideltronik Poland (Sucha Beskidzka) has ended production of the ARES series UPS.
  2. Warranty repairs were done only at the factory service until 31 August 2022.
  3. From 1 September 2022 factory service support ended and repairs can no longer be done at the factory service.
  4. Fideltronik Inigo Sp. z o.o. says it will continue post-warranty repair support for ARES users within its current technical capabilities.
  5. The notice is in Polish and contains no technical specifications; it is lifecycle information only.

Using it in design

  • Do not select the ARES series for new designs or list it as a currently produced catalogue product.
  • For sites with ARES UPS in service, record in the maintenance plan that service support continues through the distributor after 1 September 2022.
  • Reflect spare-part and repair risk in the equipment renewal plan and in critical-load redundancy.
  • Keep lifecycle notices as the cited source in the product record.

Who should read it

Facility managers operating ARES series UPS, maintenance planners and product catalogue owners.

Document contents

  1. End of ARES series production
  2. End date of factory service support
  3. Post-warranty repair support

Publication details

Authors
Fideltronik Inigo
Publisher
Fideltronik Inigo
Year
Year not stated
Document language
Polish
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Fideltronik Inigo Fideltronik ARES production and factory service notice. Fideltronik Inigo. https://fideltronikinigo.pl/wsparcie/wazna-informacja-o-zasilaczach-ups-serii-ares/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.