Technical guideFree to readYear not stated

MUST EH9335 Three Phase Series 10-40KVA: specification table

Original title MUST EH9335 Three Phase Series 10–40KVA: specification table

MUST Energy

Product page for MUST Energy's EH9335 series of 10, 20, 30 and 40 kVA three-phase double-conversion UPS, with 0.99 input power factor, at least 94.5 percent full-load efficiency and parallel operation of up to 4 units.

On this page

Overview

The page presents the EH9335 family, a high-frequency three-phase (3/3) double-conversion online UPS. There are four models: 10K, 20K, 30K and 40K. Rated capacities are written as 10 kVA/9 kW, 20 kVA/18 kW, 30 kVA/27 kW and 40 kVA/32 kW. Input and output are three-phase four-wire plus ground, and the rated voltage is selectable among 380, 400 or 415 V AC.

On the input side, power factor correction (PFC) gives an input power factor of 0.99 or higher, and input current harmonics are 3 percent or less at 100 percent nonlinear load. The input voltage range is 208 to 478 V AC and the frequency range is 45-55 Hz on a 50 Hz system. At the output the rated power factor is written as 0.8 or 0.9, voltage accuracy is 1 percent, and output current harmonics are under 2 percent on linear load and under 5 percent on nonlinear load.

For batteries, the number of cells is adjustable from 16 to 20, the charging current is settable, and charging switches automatically between constant current, constant voltage and float. The table lists the battery configuration as 40 pieces of 7 Ah or 9 Ah with a maximum charging current of 5 A. The unit has a maintenance bypass switch, an EPO input, RS232 and RS485 interfaces, and optional SNMP and relay cards. Energy-saving (ECO) mode, self-check and parallel operation of up to four units are supported.

The document is a product page. Certification standards listed are EN IEC 62040-1:2019, IEC 62040-1:2017, EN 62040-2:2018 and IEC 62040-2:2016, and the executive product standard is YD/T1095-2018. The source table gives 32 kW for the 40 kVA model while the 10, 20 and 30 kVA models carry the kW values that correspond to a 0.9 power factor. The efficiency figure is stated as a lower bound at full load.

Key points

  1. Four models: 10 kVA/9 kW, 20 kVA/18 kW, 30 kVA/27 kW and 40 kVA/32 kW.
  2. Input and output three-phase four-wire plus ground; voltage option 380/400/415 V AC.
  3. Input voltage range 208-478 V AC; input power factor 0.99 or higher; input current harmonics at most 3 percent.
  4. Normal mode full-load efficiency at least 94.5 percent; transfer time to bypass and to battery 0 ms.
  5. Overload: 110 percent for 60 minutes, up to 125 percent for 10 minutes, up to 150 percent for 1 minute; above 150 percent immediate bypass.
  6. Battery configuration 40 pieces of 7 Ah (10K, 20K) or 9 Ah (30K, 40K); charging current at most 5 A; cell count adjustable 16-20.
  7. Parallel operation of up to four units with shared battery packs is supported.
  8. Operating temperature 0-40 °C, humidity 0-95 percent non-condensing, derating per GB/T 3859.2 above 1500 m.
  9. Size 775 x 335 x 978 mm (D x W x H), net weight 164-167 kg.

Using it in design

  • Check kW capacity against the critical load power factor; the 0.8 or 0.9 output power factor in the table sets the kW rating.
  • Use the overload curve (110, 125, 150 percent) as input to upstream protection and bypass selectivity studies.
  • Calculate autonomy from the 40-battery 7 Ah or 9 Ah configuration and the 5 A charge limit; assess external batteries separately if long backup is needed.
  • Include parallel operation of up to 4 units and shared batteries in the architecture for capacity growth or redundancy.
  • For sites above 1500 m or ambient above 40 °C, account for derating and cooling margin in the layout.

Who should read it

Electrical designers selecting mid-range three-phase UPS units and teams building product catalogues or data models.

Publication details

Authors
MUST Energy
Publisher
MUST Energy
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

MUST Energy MUST EH9335 Three Phase Series 10–40KVA: specification table. MUST Energy. https://www.mustpower.com/product/eh9335-three-phase-series-10-40kva/

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.