Technical guideFree to readYear not stated

L3Harris UPS with ATS and Batteries: SATCOM skid product sheet (20-DSD-223 Rev-202)

Original title L3Harris UPS with ATS and Batteries, 20-DSD-223 Rev-202, 11/2025 pp.1-2

L3Harris

This November 2025 L3Harris sheet describes a portable 21.6 kW (24 kVA) double-conversion UPS skid that combines an ATS, batteries and an environmental control unit in one enclosure for SATCOM terminals.

On this page

Overview

The two-page product sheet describes the Skid Mounted UPS, which supplies continuous power to equipment needing 208 Vac three-phase at 60 Hz (50 Hz option). The system integrates a double-conversion UPS, an automatic transfer switch (ATS) and batteries inside an insulated, environmentally controlled enclosure. The UPS is rated 21.6 kW (24 kVA). It is an integrated power skid for a ground terminal, not a standalone IT UPS.

The enclosure is rainproof and built for extreme weather, finished in CARC to MIL-STD-53072 outside and inside the doors, can be lifted by forklift when loaded and is ATTLA certified for air transport. The battery system has 40 cells with hydrogen monitoring and venting. Cooling uses 2 x 12000 BTU environmental control units, each with a 2 kW heat figure, and the sheet describes the cooling as N+1.

Inputs are 2 x 208 Vac (125 A), three-phase four-wire, 60 Hz; 50 Hz requires a programming dongle. Outputs are 2 x 208 Vac (60 A) three-phase four-wire at 47-63 Hz and 6 x 120 Vac (15 A) single-phase NEMA 5-15 duplex outlets, plus an emergency power off (EPO) input and Ethernet with SNMP v1 and v3. The ATS is open transition with a 200 A continuous rating. Operating temperature is 0 to 55 C.

The sheet claims protection against power loss, unstable power and voltage sag, and a 30-minute protection time; no load is stated for that figure, so it should not be read as a runtime guarantee. Dimensions are 104 x 100 x 74 in (W x H x L) and weight is 6,100 lb. The document is a marketing summary and carries no efficiency, battery capacity or load-curve data.

Key points

  1. Double-conversion UPS rated 21.6 kW (24 kVA), 208 Vac three-phase, 60 Hz (50 Hz option via programming dongle).
  2. Input: 2 x 208 Vac, 125 A, three-phase four-wire.
  3. Output: 2 x 208 Vac, 60 A, 47-63 Hz and 6 x 120 Vac, 15 A, 50/60 Hz NEMA 5-15 outlets.
  4. Open-transition ATS, 200 A continuous; J1 ATS self start.
  5. Battery system of 40 cells with hydrogen monitoring and venting.
  6. Cooling 2 x 12000 BTU, N+1; operating range 0-55 C.
  7. Size 104 x 100 x 74 in (about 2,642 x 2,540 x 1,880 mm), weight 6,100 lb (about 2,767 kg).
  8. 30-minute protection time is given without a stated load.
  9. Ethernet SNMP v1 and v3, EPO input.

Using it in design

  • Catalogue the skid as an integrated power unit with UPS, ATS, batteries and cooling, not as an IT UPS.
  • Do not use the 30-minute protection figure as runtime until the load is known; run the battery calculation for your own load.
  • Size the 125 A input feeder and the 60 A and 15 A output circuits to the published limits.
  • If the site is 50 Hz, add the programming dongle to the procurement requirements.
  • Plan floor loading and handling for 6,100 lb and forklift lifting.

Who should read it

Power and systems engineers evaluating portable UPS and ATS solutions for tactical and field SATCOM installations.

Document contents

  1. Product Description
  2. Enclosure Features
  3. Key Features
  4. Specifications: Physical, Inputs, Outputs

Publication details

Authors
L3Harris
Publisher
L3Harris
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

L3Harris L3Harris UPS with ATS and Batteries, 20-DSD-223 Rev-202, 11/2025 pp.1-2. L3Harris. https://l3harris.com/sites/default/files/2025-11/l3harris-ups-with-ats-batteries-satcom-cs-bcs.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.