Technical guideFree to readYear not stated

Complet UPS trifásico MAR 10K-40K manual, pp.54-55

Original title Complet UPS trifásico MAR 10K–40K manual, pp.54–55

Complet

A 55-page user manual from the Mexican supplier Complet for the MAR series of three-phase double-conversion UPSs: 10, 20, 30 and 40 kVA (8, 16, 24 and 32 kW), 3 x 220 VAC input, 91% efficiency in AC mode and 97% in ECO mode.

On this page

Overview

The manual is in Spanish and covers Complet's MAR-10, MAR-20, MAR-30 and MAR-40 models (product codes UPS-1-056, UPS-1-057, UPS-1-058 and UPS-1-059). It has seven chapters: safety and EMC, installation, operating modes and operation, display description, control module, troubleshooting and specifications. The units have three-phase input and three-phase output; they are designed for commercial and industrial use and must not be used for life-support applications. A separate single-line diagram is given for each capacity.

The specification table is on pages 54 and 55. Capacities are 10000 VA/8000 W, 20000 VA/16000 W, 30000 VA/24000 W and 40000 VA/32000 W. Nominal input is 3 x 220 VAC (three phases, neutral and PE); the input window is 88 to 155 V line to neutral and 152 to 269 V line to line, with a frequency range of 40 to 70 Hz. Input current distortion is below 5% at full load. Output is selectable among 200/208/220/240 VAC, with ±1% regulation and 60 Hz ±1% in battery mode. Transfer time is zero both from mains to battery and from inverter to bypass.

Efficiency is 91% in AC mode, 97% in ECO mode and 90% at full load in battery mode. The battery system is built from MB-2 modules at ±120 V nominal: 1, 2, 4 and 6 modules for the four models in turn. Charging voltage is ±137 V, charging current is ±4 A, and reaching 90% capacity takes 9 hours. All models share one cabinet size, 59 x 97 x 143 cm. Net weight is 209, 283, 401 and 519 kg. Noise is below 58 dB at 1 metre.

The installation chapter sets ambient and clearance conditions: cooling air enters through the front panel, ambient temperature is kept around 30 °C and humidity below 90%. Clearances are 100 cm above, 100 cm behind and 150 cm in front of the unit, and external battery cabinets are placed alongside the UPS. The input disconnect must break phase and neutral together (four poles for three-phase). The installation chapter gives a maximum operating altitude of 1000 metres, while the specification table states that power is unaffected below 2600 metres.

Key points

  1. Models: MAR-10 (UPS-1-056) 10 kVA/8 kW, MAR-20 (UPS-1-057) 20 kVA/16 kW, MAR-30 (UPS-1-058) 30 kVA/24 kW, MAR-40 (UPS-1-059) 40 kVA/32 kW.
  2. Input: 3 x 220 VAC (3Ph+N+PE); 88...155 V L-N, 152...269 V L-L; 40...70 Hz; THDi below 5% at full load.
  3. Output: 200/208/220/240 VAC (3Ph+N); ±1% regulation in battery mode; synchronised range 56...64 Hz; crest ratio 3:1 max.
  4. Output voltage distortion at most 2% THD with linear load and 3% THD with non-linear load.
  5. Efficiency: AC mode 91%, ECO mode 97%, battery mode 90% at full load (91.5% peak).
  6. Transfer time: zero mains to battery, zero inverter to bypass.
  7. Battery: ±120 V nominal, charge ±137 V and ±4 A; MB-2 module count 1/2/4/6; 9 hours to 90% recharge.
  8. Cabinet 59 x 97 x 143 cm; net weight 209/283/401/519 kg; noise below 58 dB at 1 m.
  9. Clearances: 100 cm above, 100 cm behind, 150 cm in front.
  10. Humidity 0...95% (0...40 °C, non-condensing); per the specification table, no power derating below 2600 m.

Using it in design

  • Size the load against the kW limit at 0.8 output power factor: the 40 kVA model supplies at most 32 kW.
  • Check the 3 x 220 VAC (line-to-line) input against the site distribution; on 400 V systems, input and output transformers are needed.
  • Calculate UPS heat loss from the 91% AC-mode efficiency (about 3.2 kW at a 32 kW load) and add it to the room cooling load.
  • In the room layout, verify 150 cm in front and 100 cm behind and above, and check weights of up to 519 kg against floor loading.
  • Select a four-pole input breaker; phase and neutral must be disconnected together.
  • For sites above 1000 metres, settle the altitude limit with the manufacturer; the installation chapter gives 1000 m and the specification table 2600 m.

Who should read it

Electrical designers selecting 10 to 40 kVA three-phase UPSs, installation and commissioning teams, and engineers working in Mexico and other markets with 220 V three-phase supply.

Document contents

  1. 1. Instrucciones de Seguridad y EMC
  2. 2. Instalación
  3. 3. Modo de Operación y Operación del UPS
  4. 4. Descripción del Display
  5. 5. Módulo de Control
  6. 6. Solución de problemas
  7. 7. Especificaciones

Publication details

Authors
Complet
Publisher
Complet
Year
Year not stated
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only: the publisher’s terms apply to the original document
Original licence note

No document-specific redistribution permission was established. Bibliographic reference only.

Citation

Complet Complet UPS trifásico MAR 10K–40K manual, pp.54–55. Complet. https://www.complet.mx/downloads/ups/TRIFASICO.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Power design in SoSo CAD

Calculate supply paths, equipment loads and UPS failure scenarios as part of the design.

Single-line diagram in the SoSo CAD power and capacity workspace

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.