BICSI Japan Conference & Exhibition
About the event
BICSI affiliate regional conference and exhibition in Japan on ICT infrastructure and structured cabling, aimed at designers and installers in the Asia-Pacific region.
Who it is for / why attend
For cabling, ICT and data-centre designers: sessions on high-density AI data-centre architecture, grid-to-GPU HVDC power, liquid/immersion cooling and 800G/1.6T optical interconnects; BICSI members earn 12 CEC points.
Venue
Dates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Explore the libraryTELKODER - Telekomünikasyon Operatörleri Derneği 2021
12. Ulaştırma ve Haberleşme Şûrası – Haberleşme Çalışma Grubu Sektör Öngörü Raporu: Veri Merkezleri (TELKODER Görüşleri)
In benchmarking views, use the quoted regional PUE (about 1.6) as a Turkish baseline.
- Average PUE is quoted as 1.59 worldwide and 1.62 in Turkey's region (DCD 2020).
Cushman & Wakefield 2026
2026 Global Data Center Market Comparison
Add grid stability (T&D loss %) and power-delivery timeline fields to the site comparison matrix.
- Evaluates 107 markets across 24 variables.
JLL 2026
2026 Global Data Center Market Outlook
In the cost module, use $/MW shell-and-core benchmarks (with year) as a sanity range for capex estimates, and show tenant fit-out separately.
- Tenant technology fit-out can reach $25M per MW for AI infrastructure.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo