Cushman & Wakefield 2026
2026 Global Data Center Market Comparison
Add grid stability (T&D loss %) and power-delivery timeline fields to the site comparison matrix.
- Evaluates 107 markets across 24 variables.
Topic guide
Browse sources on regulation and public policy relevant to data centre projects. Verify the current text, effective date and applicability to your project with the responsible official source.
Cushman & Wakefield 2026
Add grid stability (T&D loss %) and power-delivery timeline fields to the site comparison matrix.
Lawrence Berkeley National Laboratory 2026
Use as a curated pointer list when updating grid-interaction and tariff knowledge.
Türkiye Büyük Millet Meclisi 2007
In the operations/energy module, compute annual energy in TEP (toe) from the energy model.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
1–24 / 84
Cushman & Wakefield 2026
Add grid stability (T&D loss %) and power-delivery timeline fields to the site comparison matrix.
Lawrence Berkeley National Laboratory 2026
Use as a curated pointer list when updating grid-interaction and tariff knowledge.
Türkiye Büyük Millet Meclisi 2007
In the operations/energy module, compute annual energy in TEP (toe) from the energy model.
Türkiye Büyük Millet Meclisi 2013
In a regulatory checklist, classify each on-site source (diesel standby, PV, BESS) against the Article 14 exemptions.
Türkiye Büyük Millet Meclisi 2016
Product/deployment: offer TR-region or on-prem hosting so Turkish customers avoid Article 9 transfers.
Türkiye Büyük Millet Meclisi 2025
When the client is public-sector or critical infrastructure, flag that security systems (access control, CCTV, network security appliances) must come from authorised suppliers.
European Commission 2026
Translate PUE and WUE targets into A-G classes: class A needs a design PUE of 1.15 or below and WUE of 0.1 or below; the class D boundary is 1.5 and 0.6. Write the class target into the design specification.
European Commission, DG ENER (AIT, Borderstep Institute, EY) 2025
Align the PUE target of new designs with the proposed MPS: design PUE below 1.3 and operational PUE below 1.4 in the first three years; for existing sites plan the path to below 1.5 by 2030.
Open Compute Project Foundation 2026
Record ASHRAE 34 safety class, GWP, ODP, boiling point and latent heat in the two-phase cold-plate fluid catalogue.
T.C. Çevre, Şehircilik ve İklim Değişikliği Bakanlığı 2008
In the building/sustainability module (TR profile), add an NSEB check for buildings of 2,000 m2 and above: target class B and at least 10 percent of primary energy from on-site renewables.
T.C. Cumhurbaşkanlığı / Bakanlar Kurulu 2007
In the TR profile, default IT-room suppression to a TS ISO 14520 clean-agent design with damper-close interlocks.
European Commission, DG ENER 2026
Track this initiative as an upcoming rule pack; leave design headroom against likely MPS indicators (PUE, WUE, waste-heat reuse readiness, grid flexibility).
European Commission 2021
Add an "EU Taxonomy 8.1" compliance profile: a Code of Conduct expected-practice checklist with justification fields for non-applicable items, and a refrigerant GWP <= 675 check in the cooling catalogue.
European Commission 2026
As labels will be issued every year from 15 August 2027, set PUE and WUE class targets (Annex I) at design stage for new and existing sites and build the metering infrastructure to the reporting requirements.
European Commission 2022
When validating server PSU data against the 2023 tier, apply an informational exception, not a hard error, for units placed on the market during 2023 (legacy stock).
European Commission 2024
Show in the operations module whether site annual energy crosses 10 TJ (audit) or 85 TJ (certified ISO 50001 energy management system); in unit terms 10 TJ is about 2.78 GWh and 85 TJ about 23.6 GWh.
European Commission 2024
When testing the 1 MW waste heat threshold, compute "total rated energy input" from rated capacity (for example utility connection or rated IT plus infrastructure), not modelled annual energy, and take the measurement point at the handover of electricity supply.
European Commission 2019
In the IT equipment catalogue store PSU efficiency at 10/20/50/100% load, power factor, active state efficiency (SERT/EN 303470) and declared operating class A1-A4, and validate new models against the 2023 tier.
European Commission 2021
In equipment catalogue validation cite EN 303470 (SERT) as the test basis for server efficiency fields and record the declared operating class as tested.
European Commission 2019
In the what-if module show direct and infrastructure savings separately for IT refresh scenarios: the document finds infrastructure savings exceed direct IT savings, which supports showing that every watt saved in IT also saves cooling and power infrastructure energy.
Open Compute Project Foundation 2026
Choose the voltage class with LV limited to 1500 VDC; check that sources stay below it in steady state (for example 750 V per pole) and that device voltage windows fit; 800 V devices with only a +/-5% range cannot operate below 750 V and are unusable there.
European Commission JRC 2019
Seed the embodied-versus-operational carbon module with the roughly one third procured assets and two thirds use-stage split as a default sanity check for LCA outputs.
European Parliament and Council of the European Union 2023
If the site's installed IT power is 500 kW or more, provide in the design for the annual Annex VII reporting and the monitoring infrastructure (energy, power utilisation, temperature set points, waste heat, water, renewables); measurement is based on the EN 50600-4 family.
U.S. Department of Energy 2025
Track as a regulatory and site news item linked to the DOE RFI and EO 14318 records.