Topic guide

Regulatory

Browse sources on regulation and public policy relevant to data centre projects. Verify the current text, effective date and applicability to your project with the responsible official source.

Sources
84
Downloadable PDFs
33
Years
1984–2027

All sources

25–48 / 84

Technical guidePDF

U.S. Department of Energy / Federal Register 2025

Accelerating Speed to Power/Winning the Artificial Intelligence Race: Federal Action To Rapidly Expand Grid Capacity and Enable Electricity Demand Growth (Request for Information, September 18, 2025)

When planning a large load connection, query the interconnection queue, transmission congestion and reconductoring potential for the relevant grid region early.

  • The RFI cites Executive Orders 14154, 14179, 14262 and 14302.
Technical guidePDF

European Commission, DG GROW (Intertek) 2016

Ecodesign Technical Assistance Study on Standards for Lot 9 Enterprise Servers and Enterprise Data Storage - Final Report (Intertek, June 2016)

When buying servers and storage use SERT results and ENERGY STAR server specifications to compare energy efficiency; the EU Code of Conduct also refers to ENERGY STAR for procurement.

  • Standardisation requests reviewed: M/545 (computers), M/462 (telecom infrastructure) and M/543 (material efficiency).
RegulationFree to read

T.C. Enerji ve Tabii Kaynaklar Bakanlığı 2000

Elektrik Kuvvetli Akım Tesisleri Yönetmeliği (Turkish Regulation on Power Installations)

In the MV module (TR profile), select transformer primary protection automatically: fused load-break switch up to 400 kVA, fused load-break switch or relay-operated breaker up to 1,600 kVA, relay-operated breaker above.

  • Apparatus must be type-tested to applicable TS, otherwise EN, HD, IEC or VDE in that order (Article 10).
RegulationFree to read

Enerji Piyasası Düzenleme Kurumu (EPDK) 2021

Elektrik Piyasasında Depolama Faaliyetleri Yönetmeliği

Treat a grid-interactive data-centre battery as storage integrated with a consumption facility: same metering point and a distribution company connection opinion are required.

  • The regulation was published in Official Gazette No. 31479 on 9 May 2021.
Technical guidePDF

Open Compute Project Foundation 2025

Embodied Carbon Disclosure Base Specification v1 (OCP/iCA Carbon Disclosure Workstream), effective July 2025

Give catalogue items (UPS, generators, switchgear, cable, CDUs, racks, concrete) an embodied-carbon block: A1-A3 kg CO2e, functional unit, method (EPD/LCA/TM65/EEIO), verification status and emission factor source, matching this disclosure template.

  • The value is normalised to a functional unit; examples are 5.1 kg CO2e per metre of cable and 700 kg CO2e per 500 kW UPS.
Technical guidePDF

European Commission JRC 2024

Energy Consumption in Data Centres and Broadband Communication Networks in the EU (JRC135926, EUR 31841 EN)

In grid connection and permitting discussions account for regional concentration (data centres are 18% of national electricity in Ireland); in dense markets grid capacity and permitting can be a critical risk.

  • EU data centres used an estimated 45-65 TWh of electricity in 2022, 1.8-2.6% of total EU electricity use.
Technical guideFree to read

European Union Agency for the Operational Management of Large-Scale IT Systems in the Area of Freedom, Security and Justice (eu-LISA) 2026

Energy-efficient data centres: a high-level overview - eu-LISA Research and Technology Monitoring Report 2026

For novice users, show the band labels (very efficient, efficient, average, inefficient) as plain-language feedback next to the computed PUE.

  • PUE bands: <= 1.2 very efficient, <= 1.3 efficient, <= 1.5 average, <= 2.0 inefficient.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.