RegulationFree to read

Kişisel Verileri Koruma Kurumu (KVKK) 2024

Regulation on the Procedures and Principles for the Transfer of Personal Data Abroad (Kişisel Verilerin Yurt Dışına Aktarılmasına İlişkin Usul ve Esaslar Hakkında Yönetmelik)

If SoSo CAD uses foreign sub-processors (cloud, email, monitoring), maintain an unmodified KVKK standard contract for each transfer path.

  • Standard contracts are published by the Board and must be used without modification (Article 14(2)-(3)).
Technical guidePDF

European Commission 2026

Report from the Commission to the European Parliament and the Council on the energy efficiency of data centres in the EU - COM(2026) 500 final

Set the PUE target for new designs against the bands in the report (below 1.2 excellent, above 1.5 needs improvement) and possible future minimum-standard thresholds, noting that the 500-1000 kW class averaged 1.64.

  • EU data centres consumed 68 TWh of electricity in 2024, expected to reach 114 TWh by 2030 (3.2% of EU electricity).
RegulationPDF

European Commission, DG ENER (Viegand Maagoe and COWI) 2023

Reporting requirements on the energy performance and sustainability of data centres for the Energy Efficiency Directive - Task A report: Options for a reporting scheme for data centres

Add an "in scope of EED Article 12" check that computes installed IT power from nominal IT equipment power and compares it with the final-text 500 kW threshold, not the 100 kW proposed in this report.

  • Average PUE of 4-5 for small data centres is quoted from the EURECA project.
RegulationPDF

European Commission, DG ENER (Viegand Maagoe and COWI) 2023

Reporting requirements on the energy performance and sustainability of data centres for the Energy Efficiency Directive - Task B report: Labelling and minimum performance standards

Add local design limits (Noord-Holland design PUE of at most 1.16, German 27 degree inlet temperature) as configurable warnings rather than hard rules, since some are drafts or local.

  • The example roll-out is metrics in year 1, voluntary pass-or-fail in year 3, rating in year 5 and mandatory requirements in year 6.
RegulationPDF

European Commission, DG ENER (Viegand Maagoe and COWI) 2023

Reporting requirements on the energy performance and sustainability of data centres for the Energy Efficiency Directive - Task C report: EU repository for the reporting obligation of data centres

Plan an "EED report export" in the design and operations model that can pre-fill the EU database template: rated IT kW, floor areas, energy, water, heat reuse and renewable fields.

  • Incoming and outgoing data traffic (PB) must be less than the corresponding bandwidth (Gbps) x 3.942.

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.