A report of the US Department of Energy's Secretary of Energy Advisory Board (SEAB) working group on powering AI and data centres, presented to the Secretary of Energy.

On this page

Overview

This report was prepared by the Working Group on Powering AI and Data Center Infrastructure of the US Department of Energy's Secretary of Energy Advisory Board (SEAB) and presented to the Secretary of Energy on 30 July 2024. It is divided into three tracks: the efficiency and power dynamics of large language model training and inference, an operational-flexibility framework, and generation and storage options.

One recommendation in the first track is the creation of a data-center-scale AI testbed within DOE, distinct from existing high-performance computing facilities (Track 1, recommendation 4). The report's overall recommendations also include better load data, a flexibility taxonomy, support for novel backup power and model tariffs. These topics form a policy frame for how the relationship between data centres and the grid might be managed.

The second track recommends developing a flexibility taxonomy and framework, with a starting taxonomy in Appendix A (Track 2, recommendation 2). The same track recommends technical, business-model and permitting support for novel backup power strategies (recommendation 3), and suggests revisiting Federal Power Act 202(c) authorities to leverage data center backup capacity (recommendation 6). Backup generation is thus treated as a resource for grid support, not only for the facility's own security.

The third track notes that data centers largely rely on diesel generation for backup, with little experience using alternatives (Track 3, finding 1). The limit of the report is that it is a policy-recommendation document: it sits in the US energy market context and is not a design standard. It gives no numerical design values. It cannot be applied directly to projects in Turkey or other regions, but is a context source for the discussion of backup power options and grid flexibility.

Key points

  1. Presented to the Secretary of Energy on 30 July 2024.
  2. Three tracks: LLM training/inference efficiency and power dynamics, operational-flexibility framework, generation and storage options.
  3. Recommends a data-center-scale AI testbed within DOE, distinct from existing HPC facilities.
  4. Recommends developing a flexibility taxonomy and framework; a starting taxonomy is in Appendix A.
  5. Recommends technical, business-model and permitting support for novel backup power strategies.
  6. Suggests revisiting Federal Power Act 202(c) authorities to leverage data center backup capacity.
  7. Data centers largely rely on diesel generation for backup, with little experience using alternatives.
  8. Further recommendations cover better load data, model tariffs and a flexibility framework.

Using it in design

  • Offer alternatives to diesel (gas, BESS, fuel cells) in backup-power design.
  • Capture grid-support capability (curtailable load, backup export) as attributes for flexibility studies.
  • Add the permitting and regulatory conditions for using backup generators for grid support to project notes.
  • Use the report's flexibility taxonomy as a starting point for defining flexibility fields in your own design tools.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Data centre power designers, engineers planning grid connection and backup power strategy, and energy policy specialists.

Publication details

Authors
SEAB Working Group on Powering AI and Data Center Infrastructure
Publisher
U.S. Department of Energy, Secretary of Energy Advisory Board (SEAB)
Year
2024
Document language
English
Source type
Government / public
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document
Original licence note

Advisory-board report written by non-federal SEAB members and hosted on energy.gov; treated as citation-only because federal authorship is not established.

Citation

SEAB Working Group on Powering AI and Data Center Infrastructure (2024). Recommendations on Powering Artificial Intelligence and Data Center Infrastructure (SEAB, July 30, 2024). U.S. Department of Energy, Secretary of Energy Advisory Board (SEAB). https://www.energy.gov/sites/default/files/2024-08/Powering%20AI%20and%20Data%20Center%20Infrastructure%20Recommendations%20July%202024.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.