Topic guide

Generators

Find references on generators and standby power for data centres. Review publications covering capacity selection, load response, fuel, emissions and operation, with bibliographic details and links to original sources.

Sources
73
Downloadable PDFs
10
Years
2006–2026

Start here

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

All sources

1–24 / 73

Research paperPDF

Springer Science and Business Media LLC (preprint) 2026

Battery reserve autonomy and diesel generator mission reliability

When presenting UPS battery autonomy as a way to improve generator reliability, compute the reserve threshold against the mission duration and report that autonomy of minutes adds little to long-outage generator reliability.

  • For a 72 h mission with Fehr parameters: 0.95617 with one generator, 0.95847 with an ideal 4 h battery reserve, 0.99808 with two independent generators.
Technical guidePDF

Open Compute Project Foundation 2026

Clean Backup Power Technology Requirements, Base Specification Version 0.3 (effective Apr 22, 2026)

Extend the generator catalogue with technology type (diesel, HVO, gas, H2 ICE, PEM fuel cell), emissions factor relative to the 1742 lb/MWh baseline, start time, block-load capability and NFPA 110 level.

  • Overload 110% for 60 s and 150% for 3 s; transient voltage response to ISO 8528-5 G3; steady-state frequency within +/-0.5%.
White paperFree to read

Schneider Electric 2011

Comparison of Static and Rotary UPS

Store UPS efficiency as a curve with at least 25/50/75/100% load points, plus storage type (battery, flywheel) and ride-through seconds.

  • Rotary can cost 40% more up front and is typically not modular.
Technical guideFree to read

Eaton 2025

Data Center as a Good Grid Citizen

Add grid-code parameters to the utility connection object: UFLS stages, LVRT curve, post-fault power recovery ramp (%/s) and short-circuit ratio at the PCC.

  • Typical BESS Li-ion cells are limited to about 1C discharge.
Technical guideFree to read

Aksa Power Generation 2020

Data Center Power Systems

Keep both standby and DCC kVA per model in the generator catalog; where data is missing, use DCC ~0.9-0.94 x standby as a flagged estimate.

  • Data-centre generator range up to 3,000 kVA standby.
Research paperPDF

arXiv (University of South Carolina) 2026

Data-Driven Generator Transient Prediction for Digital Twin Decision Support

In data-centre generator load-transfer and retransfer sequencing, size load steps against generator voltage and frequency limits, and split steps whose prediction band crosses a limit into smaller steps.

  • Even at steady load, the low-inertia, governor-controlled generator showed low-frequency oscillations of about 3 V and 0.5 Hz.