Comparing IEC 61850 vs. Traditional Monitoring, Protection and Control Solutions in Large Data Centers
Schneider Electric · Brice Martinot-Lagarde, Julien Moreau
Schneider Electric WP 285 (2021) compares a conventional PLC plus Modbus/TCP scheme with an IEC 61850 station-bus scheme for the same medium-voltage design.
On this page
Overview
The basis is Schneider reference design RD107: 4 data halls x 2.8 MW = 11.2 MW IT, 15 MVA total, two utility incomers in main-tie-main, centralized MV generators with 2 gensets per generator switchboard designed N+2. The closed-loop arrangement calls for differential and directional protection and automatic transfer logic. IEC 61850 replaces hardwired inter-trips and remote I/O with supervised GOOSE messages over a PRP/MRP redundant network, at the cost of more upfront engineering and validation.
GOOSE messages are fast (under 4 or 10 ms), self-monitored multicast. IEC 62439 PRP and HSR recover the network in under 1 ms with zero packet loss, which RSTP cannot meet; the study used PRP plus an MRP backbone ring. The Modbus/TCP alternative used an RSTP ring of 8 Ethernet switches with hardwired relay-to-PLC signals for blocking schemes. Hardwired inter-trip signals are not supervised, so wiring failures go unnoticed until a protection operation is needed, whereas GOOSE links raise an alarm on communication faults.
IEC 61850 reduces on-site work time 2-3x and the LV-section footprint of MV switchboards by 5%, while engineering studies and validation/FAT are about 30% higher. KPI scores (IEC 61850 versus Modbus/TCP): safety 0, CapEx subtotal 0, reliability +2, scalability +3, time to market +1, footprint +1, operation and maintenance +5, total +12. The authors limit applicability to large sites (10 MW IT or 15 MVA total or more), complex non-radial MV topologies, multi-site repeated designs, fast deployment, frequent evolution, or advanced functions such as microgrid, load shedding and load balancing. Related standards are IEC 61850, IEC 62439-3, IEC 62439-2 and IEEE 802.1D.
Key points
- RD107: 4 x 2.8 MW = 11.2 MW IT, 15 MVA, two main-tie-main incomers, 2 gensets per MV generator switchboard, N+2.
- GOOSE: under 4 or 10 ms, self-monitored multicast.
- PRP and HSR recover in under 1 ms with zero packet loss; RSTP cannot.
- Modbus/TCP alternative: 8-switch RSTP ring and hardwired signals.
- IEC 61850 cuts site work 2-3x and LV-section footprint 5%; engineering and validation/FAT about 30% higher.
- KPI total +12: reliability +2, scalability +3, operation and maintenance +5.
- Hardwired inter-trips are unsupervised; GOOSE alarms on communication faults.
- Applicability: 10 MW IT or 15 MVA and up, complex MV topology, repeated designs or functions like load shedding.
Using it in design
- Add a protectionControlScheme attribute to the MV module: hardwired_plc_modbus, iec61850_station_bus, iec61850_process_bus.
- Suggest IEC 61850 when IT load is 10 MW or more or the facility 15 MVA or more with MV-centralized generation or closed-loop or daisy-chain MV topology.
- When IEC 61850 is chosen, require PRP or HSR (IEC 62439-3) for the protection network and flag RSTP as non-compliant for GOOSE inter-tripping.
- Add an SCD-file baseline and pre-FAT simulation to the commissioning checklist, and assume about 30% more engineering/FAT but 2-3x shorter site work in schedules.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers and commissioning engineers choosing the MV protection and control architecture of large data centres.
Related standards
- IEC 61850
- IEC 62439-3
- IEEE 802.1D (RSTP)
- IEC 62439-2 (MRP)
Publication details
- Authors
- Brice Martinot-Lagarde; Julien Moreau
- Publisher
- Schneider Electric
- Year
- 2021
- Document number
- WP 285
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Brice Martinot-Lagarde; Julien Moreau (2021). Comparing IEC 61850 vs. Traditional Monitoring, Protection and Control Solutions in Large Data Centers. Schneider Electric. WP 285. https://download.schneider-electric.com/files?p_Doc_Ref=SPD_WP285_EN
Events on this subject
Browse the events calendarAll content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.