Technical guideFree to read2025

Design Considerations for Generator Set Mounted Paralleling Circuit Breakers

Cummins · Hassan Obeid

Cummins Bulletin 5600618 (Hassan Obeid, 2025) examines what changes when the paralleling breaker moves from remote switchgear onto the generator set itself, with a distribution board or collector bus as the common point of connection.

On this page

Overview

Moving the breaker onto the set reopens questions of fault current, bus and cable bracing, load flow, grounding and maintenance isolation. The paper works through each with simple formulas. Every supply-side breaker needs an interrupting rating at or above Imafc, the sum of fault contributions from all gensets, motor loads and utility transformers that can be connected at the same time.

Genset fault current is Iafc = (kW x 1000) / (sqrt3 x V x pf x X"d), with X"d the per-unit subtransient reactance on the set rating. Motor contribution is approximated by locked-rotor current and utility contribution by transformer rating divided by impedance. For supply current, Igsc = kW / (sqrt3 x V x pf); the total must not exceed the paralleling bus continuous rating, shown with three 2,000 A sets on a 6,000 A bus.

On grounding, NEC 2014 230.95 requires ground-fault protection at the service disconnect, for example on 277/480 V or 347/600 V systems with an overcurrent device of 1000 A or more. NEC 700.6(D) requires only ground-fault indication at the emergency source. In four-wire systems neutral and ground are bonded at one place only, to avoid nuisance ground-fault tripping.

Key points

  1. Supply-side breakers need interrupting rating at or above Imafc, the sum of all simultaneously connectable genset, motor and transformer contributions.
  2. Genset fault current: Iafc = (kW x 1000) / (sqrt3 x V x pf x X"d).
  3. Motor fault contribution uses locked-rotor current; utility contribution uses transformer rating over impedance.
  4. Total generator supply current must not exceed the paralleling bus continuous rating (example: three 2,000 A sets on a 6,000 A bus).
  5. NEC 2014 230.95 requires ground-fault protection at the service disconnect (e.g. 277/480 V with devices of 1000 A or more).
  6. NEC 700.6(D) requires only ground-fault indication at the emergency source.
  7. Four-wire systems bond neutral to ground at one place only.

Using it in design

  • Sum fault current at the collector bus from catalog X"d, kW, V and pf, add motor and transformer terms, and check breaker kAIC and bus bracing.
  • Verify bus ampacity against the sum of connected generator supply currents.
  • Flag any design with more than one neutral-ground bond in a 4-wire generator system.

Monthly newsletter · free

Keep your reading list current

Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.

SoSo CAD

Review your power design in SoSo CAD

Inspect supply paths, equipment loads and UPS failure scenarios in one model.

Request a demo
Single-line diagram in the SoSo CAD power and capacity workspace

Who should read it

Electrical engineers and switchgear specifiers working on modular or distributed generator layouts.

Related standards

  • NEC (NFPA 70) 230.95
  • NEC 700.6
  • UL 1558
  • NFPA 110

Publication details

Authors
Hassan Obeid
Publisher
Cummins
Year
2025
Document number
Bulletin 5600618
Document language
English
Source type
Manufacturer
Access
Free to read
Licence
Copyright retained; citation only — the publisher’s terms apply to the original document

Citation

Hassan Obeid (2025). Design Considerations for Generator Set Mounted Paralleling Circuit Breakers. Cummins. Bulletin 5600618. https://mart.cummins.com/imagelibrary/data/assetfiles/0056588.pdf

All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.