Specifying Standby Generator Set Requirements for Data Centers
Cummins · Mark Taylor, Earnest Glaser et al.
A Cummins PowerHour webinar from August 2022 covers generator selection for data-center loads through site derating, reactive capability, constant-power load acceptance and harmonic distortion. It argues that a kW/kVA estimate alone is not enough.
On this page
Overview
The webinar lists what must be considered when selecting a generator for a data-center load: altitude and temperature derating, load characteristics, reactive capability, constant-power load acceptance and harmonic voltage distortion. The presenters stress manufacturer sizing evidence and a realistic operating sequence, meaning the chosen set should be judged under site conditions and the real load steps rather than on its nameplate rating.
The transient specification should reflect the operating sequence. The manufacturer is expected to document the proposed set against the specified transient limits using its own sizing tools. On harmonics, voltage distortion depends on two things: load current distortion and source impedance. An acceptable distortion level therefore cannot be established without generator sizing evidence. This gives the specification writer a practical task: state the transient limits together with the load-step order they apply to, because only then can the manufacturer show a result with its tool.
The presentation is an engineering webinar, not a full standard; it gives no numeric thresholds and should be read with ISO 8528. It still leaves the designer a clear warning: a fixed kW or kVA calculation does not by itself prove transient, reactive or harmonic suitability under nonlinear loads such as UPS. The webinar's value is the list of acceptance questions: at what temperature and altitude, under which load sequence and at what distortion level will the set be judged?
Key points
- Generator selection must account for altitude and temperature derating as well as load characteristics.
- Transient requirements should reflect the operating sequence; the manufacturer documents the proposed set against the specified transient limits using its sizing tools.
- Harmonic voltage distortion depends on load current distortion and source impedance, so sizing evidence is needed to establish acceptable distortion.
- Focus topics: site derating, reactive capability, constant-power load acceptance, harmonic distortion.
- The related standard is ISO 8528; the webinar gives selection logic, not numeric thresholds.
Using it in design
- Take site conditions (altitude, temperature) and nonlinear-load factors as evidenced inputs.
- Write the transient limits and operating sequence into the specification and require the manufacturer's sizing output against them.
- Do not approve transient, reactive or harmonic suitability from a kW/kVA estimate alone; record these three checks separately.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers writing generator-set specifications and procurement engineers judging a manufacturer's sizing evidence.
Related standards
- ISO 8528
Publication details
- Authors
- Mark Taylor; Earnest Glaser; Andrew Panning
- Publisher
- Cummins
- Year
- 2022
- Document number
- PowerHour, August 10, 2022
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Mark Taylor; Earnest Glaser; Andrew Panning (2022). Specifying Standby Generator Set Requirements for Data Centers. Cummins. PowerHour, August 10, 2022. https://www.cummins.com/sites/default/files/2023-04/Specifying%20Standby%20Generator%20Set%20Requirements%20for%20Data%20Centers%202022-08-10.pdf
Events on this subject
- Electricity Eurasia 2027
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
- ICCI 2027 – Uluslararası Enerji ve Çevre Fuarı ve Konferansı
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.