ICCI 2027 – Uluslararası Enerji ve Çevre Fuarı ve Konferansı
About the event
30th edition of the energy and environment fair and conference running since 1994, suited to engineers and investors in power generation, cogeneration and energy management.
Who it is for / why attend
For the power side of DC projects: product groups include UPS and critical power, energy storage, backup diesel/gas engines, generators and cogeneration. There is no data-centre-specific section; it is a general energy fair.
Venue
Yenikapı Avrasya Gösteri ve Sanat Merkezi (Dr. Mimar Kadir Topbaş Gösteri ve Sanat Merkezi)
Istanbul, Türkiye
Show on mapDates and details are compiled from official organiser sources. Check the official website for the programme, admission requirements and registration status before making plans.
Read before you go
Explore the libraryVertiv 2024
Wired for Change: Data Centers' Dynamic Shift to Hybrid Power Solutions
Extend the power-source library beyond utility plus diesel: BESS (AC- or DC-coupled to the UPS), SOFC prime power, PEM backup fuel cell, PV and CHP, each with fuel type, start time, ramp capability and emissions factor.
- UPS stored energy typically bridges 30 minutes to over 2 hours until gensets or the grid restore supply.
Eaton 2025
Data Center as a Good Grid Citizen
Add grid-code parameters to the utility connection object: UFLS stages, LVRT curve, post-fault power recovery ramp (%/s) and short-circuit ratio at the PCC.
- Typical BESS Li-ion cells are limited to about 1C discharge.
Eaton 2021
Grid-Interactive Data Centers: Enabling Decarbonization and System Stability
When sizing UPS batteries, model a grid-services band on top of the required autonomy.
- Irish field case: the UPS delivered a static 25 kW response when frequency fell below 49.70 Hz.
SoSo CAD
Compare the cost of design decisions
Evaluate equipment costs, energy expenses and total cost of ownership (TCO) using your inputs and assumptions in SoSo CAD.