Grid-Interactive Data Centers: Enabling Decarbonization and System Stability
Eaton · Janne Paananen, Ehsan Nasr
A joint Eaton-Microsoft paper explaining why low-inertia grids with a high renewable share need fast reserves and how data-centre UPS batteries can supply them.
On this page
Overview
The paper explains that low-inertia grids need fast reserves to hold frequency and defines the services involved: frequency containment reserves (FCR-D, FCR-N), fast frequency response (FFR) and PJM RegD. Required reaction time ranges from below one second for FFR to a few seconds for FCR-D, and the response can be static or droop-based dynamic. PJM's AGC sends a RegD regulation signal every two seconds, and payment depends on tracking accuracy.
A modern bidirectional UPS is shown sharing load between grid and battery or exporting power. Field cases cover the Nordics, Ireland and a Microsoft US site; in the Irish case the UPS delivered a static 25 kW response triggered when frequency fell below 49.70 Hz. Battery state of charge is split into a reserve for critical load and a band for grid services, and on alarms or lost external signals the UPS fails safe to load-protection mode.
On economics, about 50% of the cost of a BESS above 1 MW is batteries and converters; the rest is grid connection, property and building, which a data-centre UPS already has. European ancillary-service revenues range from tens of thousands up to over EUR 100,000 per MW per year.
Battery degradation depends on the market's activation pattern: lead-acid batteries may be unsuitable for many ancillary markets, and the degradation impact is small in Irish and Nordic FFR but significant in PJM or continental continuous regulation.
Key points
- Required reaction time ranges from below one second (FFR) to a few seconds (FCR-D); response can be static or droop-based dynamic.
- PJM's AGC sends a RegD signal every two seconds, and payment depends on tracking accuracy.
- Irish field case: the UPS delivered a static 25 kW response when frequency fell below 49.70 Hz.
- About 50% of the cost of a BESS above 1 MW is batteries and converters; the remainder is grid connection, property and building, which a data-centre UPS already has.
- European ancillary-service revenues range from tens of thousands up to over EUR 100,000 per MW per year.
- Battery SoC is split into a critical-load reserve and a grid-service band; on alarms or lost signals the UPS fails safe to load-protection mode.
- Lead-acid may be unsuitable for many ancillary markets; degradation is small in Irish/Nordic FFR but significant in PJM or continental continuous regulation.
Using it in design
- When sizing UPS batteries, model a grid-services band on top of the required autonomy.
- Restrict continuous-regulation services to Li-ion or similar high-cycle chemistries.
- Catalogue the UPS bidirectional rectifier and export capability, built-in frequency measurement and supported service types (FFR, FCR-D, FCR-N, RegD).
- Show the reserved backup energy separately in runtime reports.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Hyperscale and colocation designers considering grid-service revenue from UPS battery energy, and the decision makers behind it.
Related standards
- IEC 62040-3
- ENTSO-E Network Codes
Publication details
- Authors
- Janne Paananen; Ehsan Nasr
- Publisher
- Eaton
- Year
- 2021
- Document number
- WP153031EN
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Janne Paananen; Ehsan Nasr (2021). Grid-Interactive Data Centers: Enabling Decarbonization and System Stability. Eaton. WP153031EN. https://web.archive.org/web/20240916044700/https://www.eaton.com/content/dam/eaton/markets/data-center/eaton-microsoft-grid-interactive-whitepaper-wp153031en.pdf
Events on this subject
- Electricity Eurasia 2027
- The smarter E Europe (Intersolar Europe, ees Europe, Power2Drive, EM-Power)
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.