Overview
The starting point is UPS stored energy, which typically bridges 30 minutes to over 2 hours until gensets or the grid restore supply. The paper positions the UPS as a bidirectional energy resource and eventually an energy management controller. The roadmap has three stages: today, SOFCs or turbines on natural gas for prime power and BESS on the AC bus to cut genset starts; in the near future, BESS as a long-duration DC source to the UPS once high-voltage batteries are supported; long term, PEM fuel cells replace diesel and natural-gas SOFCs are retrofitted to hydrogen.
The phase split is explicit: Phase 2 replaces diesel with backup PEM fuel cells, Phase 3 uses SOFC as prime power with the grid as backup. Integration decisions include whether the fuel cell connects through a standalone DC-to-AC converter or directly on DC to the UPS. For spiky loads, dedicated single-ended substations with N+1 BESS blocks are suggested instead of spreading instability across all blocks, and raising the energy-storage voltage is listed as a way to extend battery backup time in outages.
On safety, hydrogen fuel-cell rooms need leak detection, ventilation, air recirculation and flame detection, while SOFCs can run on biogas or natural gas. The paper also addresses common misconceptions about fuel-cell safety and cost. It is a vendor roadmap with no published numerical comparison and it centres its own solution portfolio, so it is best read as a framework of architecture options.
Key points
- UPS stored energy typically bridges 30 minutes to over 2 hours until gensets or the grid restore supply.
- Roadmap: today SOFCs or turbines on natural gas for prime power and BESS on the AC bus to cut genset starts; near future BESS as long-duration DC source to the UPS; long term PEM fuel cells replace diesel and NG SOFCs go to hydrogen.
- Spiky loads can go to dedicated single-ended substations with N+1 BESS blocks rather than spreading instability across all blocks.
- Fuel-cell integration options: a standalone DC-to-AC converter or direct DC connection of the fuel cell to the UPS.
- Phase 2 replaces diesel with backup PEM fuel cells; Phase 3 uses SOFC as prime power with the grid as backup.
- Hydrogen fuel-cell rooms need leak detection, ventilation, air recirculation and flame detection; SOFCs can run on biogas or natural gas.
- Raising energy-storage voltage is listed as a way to extend battery backup time during outages.
Using it in design
- Extend the power-source library beyond utility plus diesel: BESS (AC- or DC-coupled to the UPS), SOFC prime power, PEM backup fuel cell, PV and CHP, each with fuel type, start time, ramp capability and emissions factor.
- Allow grid-as-backup topologies.
- When hydrogen storage or fuel cells are placed, require ventilation, H2 leak detection and flame detection, and warn when a dedicated BESS block for spiky AI loads lacks N+1.
- Report Scope 1 emissions by source.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical designers and strategists evaluating non-diesel backup and prime-power architectures for grid-constrained sites.
Related standards
- IEC 62282-3-100
- NFPA 2
- NFPA 855
- IEEE 1547
Publication details
- Authors
- Vertiv
- Publisher
- Vertiv
- Year
- 2024
- Document number
- SL-71292
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Vertiv (2024). Wired for Change: Data Centers' Dynamic Shift to Hybrid Power Solutions. Vertiv. SL-71292. https://www.vertiv.com/48ecc6/globalassets/documents/white-papers/wired-for-change---data-centers-dynamic-shift-to-hybrid-power-solutions-white-paper.pdf
Events on this subject
- Electricity Eurasia 2027
- ICCI 2027 – Uluslararası Enerji ve Çevre Fuarı ve Konferansı
- The smarter E Europe (Intersolar Europe, ees Europe, Power2Drive, EM-Power)
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.