How to size a genset: Proper generator set sizing requires analysis of parameters and loads
Cummins · Jim Iverson
Cummins Power Topic #7007 (Jim Iverson, 2007) lists the project parameters and load characteristics that drive generator set sizing, with numeric thresholds. It lets a reader follow by hand the reasoning embedded in the GenSize tool.
On this page
Overview
Inputs fall into two groups. Project parameters are duty, fuel, minimum load, permissible voltage and frequency dips, and altitude and temperature. Load characteristics are power factor, motor inertia and starting, non-linear loads such as VFDs, UPS and battery chargers, regenerative loads and single-phase imbalance. Cummins does not recommend running sets below 30% of rated load and suggests load banks to supplement.
Duty type matters: standby ratings generally carry no overload capability, while prime ratings generally allow at least 10%. Three-phase sets are rated at 0.8 PF, so lower PF needs a larger alternator. Lightly loaded UPS input filters are a common leading-PF source, and a set can carry up to about 10% of rated kVAR capability as leading-PF load without losing voltage control.
For non-linear loads the paper gives numbers. VFD load should stay below about 50% of generator capacity to keep THD under roughly 15%. Battery chargers require alternator oversizing from about 2.5 times running load (3-pulse) down to about 1.15 times (12-pulse). Across-the-line motors over 50 hp draw roughly 6 times running current at start, causing voltage dip, and sequencing load steps can reduce set size.
Key points
- Running below 30% of rated load is not recommended; load banks supplement.
- Standby ratings generally have no overload; prime ratings generally have at least 10%.
- A set tolerates up to about 10% of rated kVAR as leading-PF load before losing voltage control.
- Three-phase sets are rated at 0.8 PF; lower PF requires a larger alternator.
- VFD load below about 50% of capacity keeps THD under about 15%.
- Battery-charger alternator oversizing runs from about 2.5x (3-pulse) to about 1.15x (12-pulse).
- Across-the-line motors over 50 hp draw about 6x running current at start.
Using it in design
- Give the sizing engine inputs for minimum load %, maximum voltage and frequency dip, altitude and ambient derate, and per-load type (UPS rectifier pulses, VFD share, motor starting method).
- Warn when VFD share exceeds 50% of set kVA.
- Warn when leading kVAR exceeds 10% of alternator kVAR capability, as with lightly loaded UPS filters.
- Warn when normal load is under 30% of rating.
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical engineers sizing a data-centre generator for the first time, or checking the output of sizing software.
Related standards
- ISO 8528-1
- NFPA 110
Publication details
- Authors
- Jim Iverson
- Publisher
- Cummins
- Year
- 2007
- Document number
- Power Topic #7007
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Jim Iverson (2007). How to size a genset: Proper generator set sizing requires analysis of parameters and loads. Cummins. Power Topic #7007. https://mart.cummins.com/imagelibrary/data/assetfiles/0056648.pdf
Events on this subject
- Electricity Eurasia 2027
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
- ICCI 2027 – Uluslararası Enerji ve Çevre Fuarı ve Konferansı
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.