This Cummins paper explains generator-set transient behaviour on load acceptance and rejection and how the ISO 8528-5 performance classes G1-G4 are defined and tested. It warns that ignoring load profile and stepping can produce sets several times larger than needed.
On this page
Overview
The ISO 8528-5:2018 limits are tabulated. Transient frequency deviation on a BMEP load increase is no worse than -15 % for G1, -10 % for G2 and -7 % for G3; on a 100 % load decrease it is +18/+12/+10 %. Voltage deviation on load increase is -25 % (G1), -20 % (G2) and -10 % (G3), and +35/+25/+10 % on a 100 % decrease; voltage recovery is 10/6/4 s. Frequency recovery is within 10 s (G1), 5 s (G2) and 3 s (G3), with a steady-state frequency band of +/-2.5/1.5/0.5 %.
Load acceptance is tested in BMEP-dependent steps (up to five power stages, at most six steps), while load rejection is always 100 % in one step. BMEP [kPa] = P x nr x 1000 / (Vd x N); a 13 L engine at 470 kW and 1500 rpm gives 2892 kPa. Specifications, however, often phrase requirements such as 'G3 with a 60 % step'. Typical customer 'G3-equivalent' load-acceptance limits for diesel are -7 % frequency and -15 % voltage with 3 s (f) and 4 s (V) recovery.
On the load side, a static UPS tolerates +10/-15 % voltage and +/-5 % frequency and is sensitive to a frequency slew above 0.5 Hz/s; VFDs are sensitive above 1 Hz/s (from T-030). A DOL motor start draws about 4.5-8.5x FLC, while star-delta reduces it to about 2x FLC. The paper discusses why motor starting method dominates transient sizing and why full G3 on 100 % load rejection is hard to achieve.
Key points
- ISO 8528-5:2018 frequency deviation on load increase: G1 <= -15 %, G2 <= -10 %, G3 <= -7 %; on 100 % decrease +18/+12/+10 %.
- Voltage deviation on load increase G1 -25 %, G2 -20 %, G3 -10 %; on 100 % decrease +35/+25/+10 %; voltage recovery 10/6/4 s.
- Frequency recovery <= 10 s (G1), 5 s (G2), 3 s (G3); steady-state band +/-2.5/1.5/0.5 %.
- Load acceptance tested in BMEP-dependent steps (up to five power stages, max six steps); load rejection always 100 % in one step.
- BMEP [kPa] = P x nr x 1000 / (Vd x N); 13 L engine, 470 kW at 1500 rpm gives 2892 kPa.
- Typical 'G3-equivalent' diesel limits: -7 % frequency, -15 % voltage, recovery 3 s (f) and 4 s (V).
- Static UPS tolerates +10/-15 % V and +/-5 % f, sensitive above 0.5 Hz/s; VFDs sensitive above 1 Hz/s.
- DOL motor start draws about 4.5-8.5x FLC; star-delta about 2x FLC.
Using it in design
- Store per generator the ISO 8528-5 class achieved, BMEP at rated load and the maximum single load step (%) that meets the stated dip limits.
- When a data-hall spec calls for G3, check the planned load-step sequence (UPS rectifier walk-in, cooling plant motors) against the set's tested step capability rather than the class label.
- Let users define load steps and starting methods, and warn when a step exceeds the set's BMEP-based capability or the UPS slew-rate tolerance (0.5 Hz/s).
Monthly newsletter · free
Keep your reading list current
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
SoSo CAD
Review your power design in SoSo CAD
Inspect supply paths, equipment loads and UPS failure scenarios in one model.
Request a demo
Who should read it
Electrical engineers sizing data-hall generators against load steps, UPS behaviour and motor starting.
Related standards
- ISO 8528-5:2018
- ISO 8528-1
Publication details
- Authors
- Pedro Ponte
- Publisher
- Cummins
- Year
- 2025
- Document number
- Bulletin 5544386 (Rev. 2/25; earlier Bulletin 5544421)
- Document language
- English
- Source type
- Manufacturer
- Access
- Free to read
- Licence
- Copyright retained; citation only — the publisher’s terms apply to the original document
Citation
Pedro Ponte (2025). Transient Performance of Generating Sets. Cummins. Bulletin 5544386 (Rev. 2/25; earlier Bulletin 5544421). https://mart.cummins.com/imagelibrary/data/assetfiles/0058623.pdf
Events on this subject
- Electricity Eurasia 2027
- ELECO 2026 Elektrik-Elektronik ve Biyomedikal Mühendisliği Konferansı
- ICCI 2027 – Uluslararası Enerji ve Çevre Fuarı ve Konferansı
All content and rights belong to the respective authors and publishers. SoSo CAD provides only the citation, its own summary and a link to the source, and is not responsible for the sources' content.