Topic guide
Explore publications on data centre security, access arrangements and infrastructure risks. Review physical and operational measures in relation to your facility’s scope and responsibilities.
Türkiye Büyük Millet Meclisi 2016
Product/deployment: offer TR-region or on-prem hosting so Turkish customers avoid Article 9 transfers.
Türkiye Büyük Millet Meclisi 2025
When the client is public-sector or critical infrastructure, flag that security systems (access control, CCTV, network security appliances) must come from authorised suppliers.
Schneider Electric 2021
Give every network-managed infrastructure device (UPS card, rack PDU, CRAC/CRAH controller, BMS gateway, sensor) catalogue fields for TLS support, RBAC support, IEC 62443-4-2 certification (SL level) and SDL certification.
Monthly newsletter · free
Once a month: new library sources, changes to Turkish regulations and upcoming data centre events.
1–24 / 51
Türkiye Büyük Millet Meclisi 2016
Product/deployment: offer TR-region or on-prem hosting so Turkish customers avoid Article 9 transfers.
Türkiye Büyük Millet Meclisi 2025
When the client is public-sector or critical infrastructure, flag that security systems (access control, CCTV, network security appliances) must come from authorised suppliers.
Schneider Electric 2021
Give every network-managed infrastructure device (UPS card, rack PDU, CRAC/CRAH controller, BMS gateway, sensor) catalogue fields for TLS support, RBAC support, IEC 62443-4-2 certification (SL level) and SDL certification.
Telecommunications Industry Association (TIA) 2024
Offer a rating-level selector (Rated-1..4) that is separate from Uptime Tiers.
T.C. Cumhurbaşkanlığı Siber Güvenlik Başkanlığı 2026
Provide a Turkey public-sector compliance checklist mapping the measures to design objects: dedicated IT UPS, N+1 air conditioning with auto changeover, redundant feeds, generator fuel redundancy, room adjacency checks against wet areas.
Schneider Electric 2026
For multi-site designs add a monitoring-coverage check: every UPS, cooling unit, rack PDU and environmental sensor needs a network management interface, otherwise warn unmonitored device.
Uptime Institute Intelligence 2022
Add EMP and geomagnetic disturbance (GMD) to the risk register as an optional site hazard.
Bilgi Teknolojileri ve İletişim Kurumu (BTK) 2014
In the telecom client profile, enforce 2-year access-log retention, underground or protected utility entries and support-system redundancy checks.
Legrand 2024
In the layout tool, auto-place temperature/humidity sensors at least every fourth cabinet or every 3-9 m of aisle, at inlet heights including about 1.5 m, and flag aisles with none.
Journal of Physics: Conference Series (IOP Publishing) 2018
Compare ORS design concentration with the 15-16% standard-test values in VdS 3527 and EN 16750; since large-scale hard-limit LOCs (11.1% for cartoned commodities, 13.0% for uncartoned plastics) are lower, justify the design safety margin against them.
Data Center World / AFCOM 2026
Use 27 kW as the 2026 AFCOM average-density reference in density selectors.
Schneider Electric 2023
Add tenantId and commercialStatus (open, closed, reserved, internal) to racks, cages and floor zones, with a floor-plan overlay coloured by status and per-zone remaining power, cooling and ports.
Schneider Electric 2026
Give every asset type, serial, rack/U location, network port, explicit A/B power path (rack PDU, UPS, PDU, switchgear) and cooling-unit dependency so the design exports as a DCIM digital twin.
Schneider Electric 2011
Give edge and closet room templates a default monitoring package: door switch, temperature at 3 heights, leak detector, camera, network management card on UPS and cooling, and metered/switched PDUs with sequencing.
Schneider Electric 2020
Add a processCoupling flag (in_series, in_parallel) to edge sites; for in_series default the availability target to Tier III equivalent and require redundant UPS/cooling (N+1 or 2N) plus maintenance bypass.
ISO/IEC 2021
At project setup, offer ISO/IEC 22237 alongside EN 50600 as a selectable standard profile.
ISO/IEC 2024
In the site module, build a site-risk checklist keyed to the chosen protection class: flood, seismic, adjacent hazards and access routes.
ISO/IEC 2024
Tag each room in the floor plan with a protection class and check that access-control zones nest correctly, so a higher-class room is not reachable except through lower-class rooms.
Kişisel Verileri Koruma Kurumu (KVKK) 2025
When the 'personal data hosted' flag is set, require locked server rooms with access logging, fire and flood protection and segregated backup storage rooms in the layout checklist.
Kişisel Verileri Koruma Kurumu (KVKK) 2017
Implement scheduled purge or anonymisation jobs with a configurable interval not exceeding six months, including backups.
Kişisel Verileri Koruma Kurumu (KVKK) 2025
Treat any foreign-located support engineer's remote session into a Turkish customer's SoSo CAD instance or DCIM as a transfer and gate it behind a standard-contract check.
Kişisel Verileri Koruma Kurumu (KVKK) 2024
If SoSo CAD uses foreign sub-processors (cloud, email, monitoring), maintain an unmodified KVKK standard contract for each transfer path.
Schneider Electric 2011
Auto-place 3 inlet temperature sensors per rack front, 1 humidity sensor per cold aisle, and leak rope around every CRAC/CDU and raised-floor water path.
NFPA 2025
In the fire module (US profile), place detectors per room type.