GITEX AI Türkiye 2026
About the event
The first Turkish edition of GITEX, covering AI, cloud and data centre investment.
Venue
This event has ended. The page is kept in the archive with its details and related technical reading.
Read before you go
Explore the libraryNVIDIA 2025
NVIDIA DGX SuperPOD: Next Generation Scalable Infrastructure for AI Leadership - Reference Architecture featuring NVIDIA DGX GB200
Define the cluster template with SU = 8 NVL72 racks at 1.2 MW IT; auto-place SUs in rows following the reference rack layout, allocating ~150 kW per compute rack plus network racks.
- Each SU (8 DGX GB200 NVL72 racks) requires 1.2 MW TDP.
TELKODER - Telekomünikasyon Operatörleri Derneği 2021
12. Ulaştırma ve Haberleşme Şûrası – Haberleşme Çalışma Grubu Sektör Öngörü Raporu: Veri Merkezleri (TELKODER Görüşleri)
In benchmarking views, use the quoted regional PUE (about 1.6) as a Turkish baseline.
- Average PUE is quoted as 1.59 worldwide and 1.62 in Turkey's region (DCD 2020).
Bryden Wood 2026
Densification and the geometry of change: designing data centres in an age of uncertainty
Warn when high-density liquid-cooled racks are placed on upper floors without a matching structural floor-load rating.
- Delivery takes three to five years, so a 30 kW/rack design may need to carry twice that at go-live.
SoSo CAD
From technical references to data centre design
Review rack layouts, power supplies and cooling zones in a shared SoSo CAD project model.
Request a demo